US Army Flashcards

Home › MOS decks › 12G

Engineer · MOS 12G

Drill 12G: Quarrying Specialist flashcards

This page puts every 12G card in one place: 101 questions and answers for the Quarrying Specialist job, spread across 2 decks.

Open 12G in the appJump to the cards

How to drill 12G

  1. Engineer decks mix materials, measurements and safety rules. Keep scrap paper close and work out any numbers before you check the answer.
  2. Pick one deck below and cover the answers with your hand or a sheet of paper.
  3. When a deck feels easy, open 12G in the app and choose Practice test. It asks multiple-choice questions built from these same cards.

With 101 cards, try about 5 short rounds of 25 cards instead of one long session. One or two rounds a day keeps it fresh.

12G decks on this page

12G – Part 2: Quarry Siting, Crushing, Blast Design & Blasting Safety

Source: TM 3-34.65/NTRP 4-04.2.12/AFMAN 10-903, Quarry Operations (30 Oct 2013)

12G: What are the three geologic groups of rock?
Igneous, sedimentary and metamorphic.
TM 3-34.65 (30 Oct 2013), para 1-1
12G: What is the main drawback of granite as a construction stone?
When heated and chilled, its quartz and feldspar grains expand and contract at different rates, so the surface can crumble or peel.
TM 3-34.65 (30 Oct 2013), para 1-3
12G: Which igneous rocks are usually good for construction when fresh and unweathered?
Intrusive rocks; they have high crushing and shearing strength and often make excellent concrete aggregate. Extrusive rocks need extensive examination first.
TM 3-34.65 (30 Oct 2013), para 1-4
12G: How much calcium carbonate makes a rock limestone?
More than 50 percent, as calcite.
TM 3-34.65 (30 Oct 2013), para 1-6
12G: What Mohs hardness range is best for construction rock?
5 to 7. Below 5 is too soft; above 7 is too hard to crush.
TM 3-34.65 (30 Oct 2013), para 1-11 and table 1-1
12G: How do you do the expedient field hardness test with a file?
If a file scratches the rock, it is below 6.5. If the rock scratches the file, it is above 6.5. If it scratches a knife blade or glass but not the file, it is 5.5 to 6.5.
TM 3-34.65 (30 Oct 2013), para 1-11
12G: How are potential pit and quarry sites prioritized?
Known (used before and meet criteria), probable (good material seen on field recon), and possible (found from other sources, not field checked).
TM 3-34.65 (30 Oct 2013), para 2-8
12G: What is the primary factor governing the quality needed from quarry material?
The intended use of the material.
TM 3-34.65 (30 Oct 2013), para 2-14
12G: What must you leave out when estimating the volume of a site?
Unsuitable or unusable material, waste and overburden. Include a safety margin.
TM 3-34.65 (30 Oct 2013), para 2-15
12G: Why does broken rock take up more volume than rock in place?
In-place material is compacted; when removed or broken it swells.
TM 3-34.65 (30 Oct 2013), para 2-16
12G: How do you estimate the quantity of rock in a quarry?
Multiply the average depth of the face by the working area, then deduct the overlying waste rock and overburden.
TM 3-34.65 (30 Oct 2013), para 2-16
12G: When may overburden make a site not worth excavating?
When overburden is more than one-third of the depth of usable material.
TM 3-34.65 (30 Oct 2013), para 2-19
12G: Are quarries normally worked wet or dry?
Dry, unless that is impractical or impossible (such as coral reef operations).
TM 3-34.65 (30 Oct 2013), para 2-19
12G: Why is bank (hill) gravel desirable for surfacing?
It is clayey gravel, which has binding qualities.
TM 3-34.65 (30 Oct 2013), para 3-1
12G: How far should bulldozers push topsoil when stripping a pit?
Up to about 300 feet; use scrapers beyond 300 feet.
TM 3-34.65 (30 Oct 2013), para 3-4
12G: What should you do if scrapers with pushers can't get a full load of consolidated gravel in about 100 to 150 feet?
Use a rooter or ripper; if it is still too consolidated, it may need blasting.
TM 3-34.65 (30 Oct 2013), para 3-8
12G: What machine is best for underwater digging in a submerged gravel pit?
A dragline.
TM 3-34.65 (30 Oct 2013), para 3-13
12G: What are the three basic quarry types?
Hillside, subsurface and terrain quarries.
TM 3-34.65 (30 Oct 2013), para 4-3
12G: Name two advantages of a subsurface quarry and its main drainage drawback.
It is masked from view, contains noise and gives some weather protection, but it will not drain naturally.
TM 3-34.65 (30 Oct 2013), para 4-3
12G: How should the quarry face be oriented in steeply inclined strata?
Perpendicular to the strike, giving a vertical or near-vertical face. A face parallel to the strike gives a hazardous overhang or extended toe.
TM 3-34.65 (30 Oct 2013), para 4-4 and 4-8
12G: What is the normal maximum grade for quarry haul roads?
Normally not more than 10 to 15 percent.
TM 3-34.65 (30 Oct 2013), para 4-15
12G: What may you NOT use for dust control on haul roads?
Waste oil. (Use water, geotextiles, asphalt or road oil.)
TM 3-34.65 (30 Oct 2013), para 4-15
12G: Where should the crushing, screening and washing plant be placed relative to the quarry?
Close to cut haul time, but far enough away that blasting doesn't endanger it or the crew.
TM 3-34.65 (30 Oct 2013), para 4-17
12G: Why are crushing operations usually set up on two levels?
Rock is dumped into the feeder or chute on the upper level, processed, and discharged on the lower level by conveyors; single-level work is less efficient and less safe.
TM 3-34.65 (30 Oct 2013), para 4-18
12G: What are the two primary methods of crushing rock?
Compression (jaw, roll and cone crushers) and impact.
TM 3-34.65 (30 Oct 2013), para 4-22
12G: When do compression crushers work best?
When fed to capacity; that gives the least wear and the most uniform shape and gradation.
TM 3-34.65 (30 Oct 2013), para 4-22
12G: What is the reduction ratio of a jaw crusher, and how big can shot-rock feed be?
6:1; shot rock up to 90 percent of the feed opening (80 percent for gravel).
TM 3-34.65 (30 Oct 2013), para 4-23
12G: Which crusher is the most universally used primary crusher?
The overhead eccentric jaw crusher.
TM 3-34.65 (30 Oct 2013), para 4-23
12G: Which crushers are standard for secondary and tertiary crushing?
Cone crushers.
TM 3-34.65 (30 Oct 2013), para 4-26
12G: Why shouldn't spray bars point straight down at the screen with high pressure?
It drives near-size material into the screen and causes blinding. Spray with or toward the material flow.
TM 3-34.65 (30 Oct 2013), para 4-35
12G: Where does the coarsest material end up when a conveyor builds a stockpile?
On the outside of the pile in line with the conveyor; the finest is directly under the conveyor.
TM 3-34.65 (30 Oct 2013), para 4-40
12G: Name three conveyor "nevers."
Never run it with the belt out of alignment or rubbing a frame, never run it with rollers not turning, and never take material off a moving belt by hand.
TM 3-34.65 (30 Oct 2013), para 4-41
12G: What is a Grizzly?
A coarse screen of steel rails on a rigid frame, used to size rock before crushing.
TM 3-34.65 (30 Oct 2013), para 4-47
12G: What is the optimum feed size to a crusher, as a rule of thumb?
75 percent of the jaw dimensions (a cross-piece-free Grizzly uses bar spacing of 75 percent of the smallest dimension or less).
TM 3-34.65 (30 Oct 2013), para 4-47
12G: How do you plan benches when bad layers occur in a deposit?
So undesirable and desirable material can be excavated separately, preventing contamination.
TM 3-34.65 (30 Oct 2013), para 4-48
12G: If drill steel length is limited, what is the maximum bench height?
Drill steel length minus the subdrilling depth (feet).
TM 3-34.65 (30 Oct 2013), para 4-49
12G: How much does drill efficiency drop for each added length of steel?
About 20 percent, so lower benches are preferred in hard or badly fractured rock.
TM 3-34.65 (30 Oct 2013), para 4-49
12G: What are the typical initial cuts in an open-pit quarry?
Toe cuts and ramp cuts (plus full-face cuts parallel to strike if needed).
TM 3-34.65 (30 Oct 2013), para 4-58; 5-4
12G: What communication is required before blasting in a quarry?
A warning by radio, wire or special signal device, and support personnel need direct radio contact with the blasting supervisor.
TM 3-34.65 (30 Oct 2013), para 4-59
12G: Name four things a quarry operations plan must consider.
Any four: production, equipment availability, rock formation geology, maintenance, training, environmental and safety procedures.
TM 3-34.65 (30 Oct 2013), para 4-60
12G: What slope should the quarry working floor have, and which way?
About 3 percent, sloping away from the face so water doesn't collect.
TM 3-34.65 (30 Oct 2013), para 4-65
12G: What environmental rules must the quarry maintenance area meet?
EPA laws on collecting, preventing spills of, and storing petroleum products and other hazmat; identify trained spill response teams in advance.
TM 3-34.65 (30 Oct 2013), para 4-66
12G: How is the volume of a quarry cut figured?
Bench height (depth) × length (total spacing) × width (total burden).
TM 3-34.65 (30 Oct 2013), para 5-1
12G: How wide should a cut be, at minimum?
No less than the effective working radius of the excavating equipment.
TM 3-34.65 (30 Oct 2013), para 5-2
12G: How far below grade are cuts meant to break rock?
1 to 3 feet below grade.
TM 3-34.65 (30 Oct 2013), para 5-5
12G: When is a toe cut needed in a hillside quarry?
Unless the rock already has a vertical face, the rock toe must be removed before excavation starts.
TM 3-34.65 (30 Oct 2013), para 5-6
12G: What is a ramp cut used for?
Excavating a ramp into a subsurface quarry; the first blast sets a vertical face.
TM 3-34.65 (30 Oct 2013), para 5-7
12G: What is the rule of thumb for bench (face) height?
100 to 120 times the borehole diameter in inches, divided by 12 to get feet.
TM 3-34.65 (30 Oct 2013), para 5-9
12G: What simple method measures a low, nearly vertical face?
The tape-and-pole method: level a board or pole past the face and tape down to the toe.
TM 3-34.65 (30 Oct 2013), para 5-9
12G: What stray-current level stops loading of electric detonators?
More than 0.05 amperes through a 1-ohm resistor at the detonator location; find and correct the source before loading.
TM 3-34.65 (30 Oct 2013), para 6-14
12G: What do non-detonator-sensitive explosives like ANFO and water gels need to fire reliably?
A booster; a Number 8 cap alone won't reliably detonate them. They are safer to handle and transport.
TM 3-34.65 (30 Oct 2013), para 7-4
12G: What are the standard water-resistance ratings for explosives?
Excellent 72 hours, good 24, fair 8, poor 1 (hours submerged in static water and still reliable).
TM 3-34.65 (30 Oct 2013), para 7-10
12G: What are the most common toxic gases after a blast?
Carbon monoxide and nitrogen oxide; let fumes disperse before anyone returns.
TM 3-34.65 (30 Oct 2013), para 7-11
12G: How should explosive stock be rotated?
Continuously, using the oldest first per the manufacturer; explosives deteriorate with age.
TM 3-34.65 (30 Oct 2013), para 7-18
12G: What are the three main types of commercial dynamite?
Straight (standard), ammonia and gelatin.
TM 3-34.65 (30 Oct 2013), para 7-22
12G: Name two safety advantages of water gels over dynamite.
No nitroglycerin, and more resistant to accidental initiation from impact, shock or fire.
TM 3-34.65 (30 Oct 2013), para 7-51
12G: What is the ANFO mix by weight?
94 percent ammonium nitrate and 6 percent fuel oil (No. 2 diesel), or 50 lb of AN prills to 3 quarts of fuel oil.
TM 3-34.65 (30 Oct 2013), para 7-56
12G: Why is ANFO the most widely used explosive in the world?
It is the least sensitive, safest to handle and least expensive.
TM 3-34.65 (30 Oct 2013), para 7-56
12G: What is the most important single factor in ANFO (nitrocarbonitrate) propagation?
Borehole diameter; propagation dies out faster in small holes (use limited below 4 inches).
TM 3-34.65 (30 Oct 2013), para 7-58
12G: Where should primers go in a hole loaded with ANFO?
At the bottom and top, and at least one every 20 feet.
TM 3-34.65 (30 Oct 2013), para 7-58
12G: What is true burden?
The perpendicular distance from the nearest free face to the first row of holes. Apparent burden is the distance between rows.
TM 3-34.65 (30 Oct 2013), para 8-6
12G: What happens if burden is too large or too small?
Too large: oversize rock or a high muck pile. Too small: violent blast, scattered muck, possible hole-to-hole propagation or excessive fly rock.
TM 3-34.65 (30 Oct 2013), para 8-6
12G: What is the burden estimate formula when opening a new quarry?
B = (2 × SGe ÷ SGr + 1.5) × De, using explosive density, rock density and explosive diameter (in). Example: (2 × 1.25 ÷ 2.5 + 1.5) × 4 = 10.
TM 3-34.65 (30 Oct 2013), para 8-6 and table 8-1
12G: What spacing goes with a square or a rectangle pattern?
Square: spacing = burden. Rectangle: spacing = burden × 1.1 to 1.5. Spacing should not be less than burden.
TM 3-34.65 (30 Oct 2013), para 8-7
12G: What stemming material is preferred, and how long should stemming be?
Clean crushed rock; 0.7 to 1.4 times the burden.
TM 3-34.65 (30 Oct 2013), para 8-9
12G: What is the rule of thumb for subdrill depth?
0.33 times the burden (J = B × 0.33). Skip subdrilling if the hole ends at a natural horizontal seam.
TM 3-34.65 (30 Oct 2013), para 8-10
12G: What is presplitting?
Firing a single row of holes before the main blast to crack a plane along the excavation limit, giving a smooth wall and less vibration.
TM 3-34.65 (30 Oct 2013), para 8-18
12G: What blast pattern is most common in construction blasting?
The staggered pattern (alternate rows offset).
TM 3-34.65 (30 Oct 2013), para 8-23
12G: Who completes the quarry shot record, and how long is it kept?
The head blaster; kept on file for five years.
TM 3-34.65 (30 Oct 2013), para 8-26
12G: What is a toe in blasting?
Excess burden (humping) at the bench floor level; it cuts output, creates a hazard and hampers drilling.
TM 3-34.65 (30 Oct 2013), para 8-27
12G: How much padding goes in the bottom of a hole before the primer in column loading?
3 to 6 inches of soft material (sand or drill cuttings).
TM 3-34.65 (30 Oct 2013), para 9-5
12G: What is decking, and what does each deck need?
Using stemming to bypass cracks, seams or voids (and to split the charge); each deck needs its own delay and booster.
TM 3-34.65 (30 Oct 2013), para 9-6
12G: How much decking controls vibration in dry and in wet holes?
6 times the borehole diameter in dry holes; 12 times in wet holes.
TM 3-34.65 (30 Oct 2013), para 9-7
12G: What is called before connecting the blasting machine?
"Fire in the hole" three times, after personnel are accounted for and clearance is received.
TM 3-34.65 (30 Oct 2013), para 9-14
12G: Which boreholes do you load first?
Those farthest from the firing point.
TM 3-34.65 (30 Oct 2013), para 9-26
12G: Who checks the blast site after firing, and how?
Preferably the head blaster, with one backup watching from a safe distance, to confirm all explosive was consumed.
TM 3-34.65 (30 Oct 2013), para 9-29
12G: What is the preferred method of secondary breakage?
Mechanical means; it avoids fly rock, clearing delays and poor size control.
TM 3-34.65 (30 Oct 2013), para 10-1
12G: How deep is a blockhole drilled in a boulder?
About 1/3 of the boulder's diameter; usually the cheapest blasting method for oversize rock.
TM 3-34.65 (30 Oct 2013), para 10-2
12G: How long do you wait after burning stops at a hangfire?
At least 60 minutes; never approach burning explosives.
TM 3-34.65 (30 Oct 2013), para 11-4 (DANGER)
12G: How long do you wait before approaching an electric and a nonelectric misfire?
Electric: 30 minutes. Nonelectric: 60 minutes. Don't remove the original cap; add a new one and detonate from safety.
TM 3-34.65 (30 Oct 2013), para 11-6 (DANGER)
12G: What must be checked after every quarry blast?
Faces and muck piles for misfires.
TM 3-34.65 (30 Oct 2013), para 11-6
12G: What is the NEWQD for quarrying?
The sum of all explosives loaded into all boreholes for the operation.
TM 3-34.65 (30 Oct 2013), para 11-11
12G: What is the MSD formula for essential personnel?
D = 1.5 × NEWQD, with a 300-foot (91.4 m) minimum, and frontal and overhead protection if closer than the non-essential distance.
TM 3-34.65 (30 Oct 2013), para 11-13
12G: What is the MSD for non-essential personnel at 2,000 lb NEWQD or less?
D = 1.5 × NEWQD, minimum 1,500 feet (457 m). Above 2,000 lb: D = 328 × NEWQD^(1/3).
TM 3-34.65 (30 Oct 2013), para 11-14
12G: Name four things you must never do when drilling and loading.
Any four: drill into explosives or a hole that held them, force explosives into a hole, tamp the primer, churn or tamp violently, drop a cartridge on the primer, lean over the hole.
TM 3-34.65 (30 Oct 2013), para 11-16
12G: How close may smoking or open flame be to explosives?
Not within 50 feet, unless separated by permanent noncombustible barriers.
TM 3-34.65 (30 Oct 2013), para 11-20; 11-15

12G – Quarrying Specialist [National Guard only]

Source: DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G); DA Pam 611-21 ch. 10 MOS/skill-level classification listing (chapter-10-base); ATP 3-34.40 (14 Apr 2023); TM 3-34.65 (30 Oct 2013). Verify current editions.

12G: What is the primary role of the Quarrying Specialist?
Status: current, Army National Guard only (DA Pam 611-21 ch. 10C). To operate quarry equipment – drilling, blasting, crushing, and screening rock – to produce aggregate for construction.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) heading ("National Guard Only") and para a
12G: In which component is 12G found?
Army National Guard only, per DA Pam 611-21 ch. 10C (10-12G, "National Guard Only"; ACASP-designated).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) heading ("Quarrying Specialist (National Guard Only)") and ACASP designation
12G: What equipment do quarry units use?
Rock drills and the Crushing, Screening, Washing Plant (CSWP), along with other electric, pneumatic and internal-combustion machines used to drill, crush, grade and wash aggregate.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) paras a and a(1)-(2); ATP 3-34.40 (14 Apr 2023) para 4-53 (rock "normally processed through a crushing and screening plant")
12G: What is aggregate used for?
Base course, surfacing and fill for roads and other construction, and aggregate for concrete and bituminous (asphalt) mixes.
TM 3-34.65 (30 Oct 2013) table 1-5 (pit and quarry classifications: primary uses) and para 2-19 (aggregate washed "for concrete and bituminous uses"); DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para a(2) (aggregate for construction projects)
12G: What safety measures are critical in quarry operations?
Blasting safety: figure minimum safe distances, use nonelectric firing when an electromagnetic radiation hazard is present, follow hangfire and misfire procedures, evacuate and guard the area in an explosives emergency, and store and handle explosives per DoD 6055.09-M.
TM 3-34.65 (30 Oct 2013) ch. 11 (Blasting Safety: hangfires, misfires) and para 11-7 (general safety precautions). Other quarry hazards (dust, noise, highwall stability) were not found in TM 3-34.65 or ATP 3-34.40 and were removed
12G: What doctrine covers general engineering tasks like quarrying?
ATP 3-34.40, General Engineering.
ATP 3-34.40 (14 Apr 2023) paras 1-8 (quarry teams assist in quarry, borrow pit and rock crushing) and 4-53 (refers to TM 3-34.65 (30 Oct 2013), Quarry Operations, for quarry layout, blasting and safety)
12G: How does DA Pam 611-21 summarize the 12G major duties?
The quarrying specialist supervises or operates electric, pneumatic, and internal combustion powered machines used in drilling, crushing, grading, and washing gravel aggregate for construction projects. (ch. 10C)
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para a
12G: What minimum ASVAB line score does DA Pam 611-21 list for 12G?
93 in GM (General Maintenance) (ch. 10C; verify current standards).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para b(4)(a) (GM 93; checked against 10C)
12G: What physical demands rating applies to 12G?
Significant (Gray), with a minimum physical profile of 222221; normal color vision required (ch. 10C).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) paras b(1)-(3)
12G: Under whose auspices is the 12G MOS course conducted?
The USA Engineer Center and School (DA Pam 611-21 ch. 10C).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para b(5)
12G: What are examples of additional skill identifiers (ASIs) for 12G?
B9 – Bradley Fighting Vehicle (BFV); P6 – Project Management; Q6 – Protection Cell Operations; R7 – Army Reconnaissance (DA Pam 611-21 ch. 10C).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para c(1)-(4)
12G: What does DA Pam 611-21 list as 12G duties at skill level 1?
Performs Preventive Maintenance Checks and Services (PMCS), assembles, adjust, and operates the Crushing, Screening, Washing Plant (CSWP). (ch. 10C)
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para a(1) (MOSC 12G1O)
12G: What does DA Pam 611-21 list as 12G duties at skill level 2?
Supervises PMCS of CSWP and rock drills. Supervises assembly, adjustment, calibration, and operation of CSWP in the production of aggregate for construction projects. (ch. 10C)
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para a(2) (MOSC 12G2O)
12G: What does DA Pam 611-21 list as 12G duties at skill level 3?
Supervises rock production operations. Directs the production of crushed, washed, and graded aggregate. (ch. 10C)
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) para a(3) (MOSC 12G3O)
12G: What does a 12G do with explosives?
Detonates explosives to blast rock in quarries, under strict explosive safety and accountability rules (DA Pam 611-21 ch. 10C).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12G) paras a and a(1)-(2) (loads boreholes, assembles nonelectric firing circuits, detonates explosives) and b(6); blasting safety: TM 3-34.65 (30 Oct 2013) ch. 11

Keep going: more Engineer decks

Not your job? Use the MOS deck finder or see every MOS deck by career field.