Drill 12R: Interior Electrician flashcards
This page puts every 12R card in one place: 165 questions and answers for the Interior Electrician job, spread across 6 decks.
- 165 cards
- 6 decks
- Quiz mode
How to drill 12R
- Engineer decks mix materials, measurements and safety rules. Keep scrap paper close and work out any numbers before you check the answer.
- Pick one deck below and cover the answers with your hand or a sheet of paper.
- When a deck feels easy, open 12R in the app and choose Practice test. It asks multiple-choice questions built from these same cards.
With 165 cards, try about 7 short rounds of 25 cards instead of one long session. One or two rounds a day keeps it fresh.
12R decks on this page
- 12R – Deep Dive: Duties, Electrical Safety, Grounding & Wiring Standards80 cards
- 12R – Deep Dive: Hazardous Locations, Switches, Service Drops, Generators & Circuit Testing55 cards
- 12R – Thin Sections: Connectors & Contacts, and Safety & Risk7 cards
- 12R – Section floor: Connectors, Construction, Safety, and Tools4 cards
- 12R – Toward 20: Terminal grounding, roughing-in, tools, and pliers4 cards
- 12R – Interior Electrician15 cards
12R – Deep Dive: Duties, Electrical Safety, Grounding & Wiring Standards
Source: DA Pam 611-21 ch. 10C (10-12R, Oct 2026 copy); TM 3-34.46 (Theater of Operations Electrical Systems, 3 May 2013). Complements mos-12r-interior-electrician; does not repeat those cards. Verify current editions.
- 12R deep dive: Is 12R an Army Civilian Acquired Skills Program (ACASP) designated MOS?
- Yes. MOS 12R is an ACASP designated MOS.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R heading
- 12R deep dive: Besides installing and maintaining interior electrical systems up to 600 volts, what other duties does DA Pam 611-21 list for a 12R1O?
- A 12R1O installs service-entrance systems, electrical boxes, conduit systems, cable systems, switches, receptacles, fixtures, service panels, grounding systems, and 240-50 hertz international electrical systems. The Soldier also interprets electrical prints, schematics, and drawings and international codes and standards; maintains electrical tools; troubleshoots malfunctions in electrical circuits; performs generator operations; prepares a material takeoff list; and rescues an electrical-shock victim.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R a(1)
- 12R deep dive: What duties does DA Pam 611-21 list for a 12R2O?
- A 12R2O supervises installation and maintenance of interior electrical systems, coordinates construction planning and advises on electrical construction, uses test equipment to isolate malfunctions and repair defects in systems and components, inspects interior electrical systems and components for proper installation in accordance with the National Electrical Code and local ordinances, and ensures proper safety procedures are used.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R a(2)
- 12R deep dive: What minimum Occupational Physical Assessment Test (OPAT) scores does DA Pam 611-21 require for 12R?
- Standing Long Jump 120 cm, seated Power Throw 350 cm, Strength Deadlift 120 pounds, and Interval Aerobic Run 36 shuttles, in Physical Demand Category “Moderate” (Gold).
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R b(4)(b)
- 12R deep dive: What phobia restrictions does DA Pam 611-21 list for 12R?
- No record of acrophobia or claustrophobia.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R b(7)
- 12R deep dive: What civilian experience does DA Pam 611-21 require for 12R ACASP qualification?
- A minimum of 2 years experience as an apprenticed member of a recognized United States Electrical association.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R b(6)
- 12R deep dive: Does a Soldier who qualifies for 12R under ACASP have to attend AIT?
- No. An Initial Entry Trainee (IET) who qualifies under ACASP will not be required to attend AIT. After Basic Combat Training, the Soldier is processed in accordance with initial assignment instructions.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R b(6)(a)
- 12R deep dive: Who approves and validates 12R ACASP qualification for an Initial Entry Trainee?
- The USAES Engineer Personnel Development Office (EPDO).
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12R b(6)(b)
- 12R deep dive: What clothing and jewelry rules apply when working on or near electrical equipment?
- Never wear clothing with uncovered zippers or other metal fasteners. Always roll shirt sleeves down. Never wear loose, flapping clothing or flammable articles such as celluloid cap visors. Never wear shoes with thin soles, heel plates, or hobnails; wear high-cut shoes with sewed soles when possible. Remove all jewelry before starting work; never wear rings, metal wrist bands, or watch chains. Inspect personal gear such as climbing gear, hard hats, and rubber gloves before use.
- TM 3-34.46 (3 May 2013), para 13-4
- 12R deep dive: How should a knife be used when stripping wire?
- Wire stripping can be done with a tool designed for that purpose or an electrician's knife. When using a knife, direct the force of cutting away from your body and other personnel.
- TM 3-34.46 (3 May 2013), para 13-8
- 12R deep dive: Are insulated tool handles enough protection against electric shock?
- No. Insulated handles are an added safety precaution only and should not be relied on for full shock immunity. Select the right tool for the job, never use tools with cracked or broken handles or heads, never use a wrench on a running motor, and never use any tool in a way that your hands or body can be injured if the tool slips. Use flashlights in dark places; never carry open flames into basements, vaults, manholes, or other dark places because of the danger of explosion or fire.
- TM 3-34.46 (3 May 2013), para 13-18
- 12R deep dive: When must an electrician wear goggles?
- Wear goggles when tinning or soldering lugs or large joints; when chipping, breaking, or drilling concrete, brick, stone, or other materials where chips are likely to fly; when doing work likely to cause flying particles, such as tree trimming; when installing or removing fuses or jumpers from live distribution buses (use approved colored lenses); and when welding. Goggles used for acetylene welding cannot be used for electric-arc welding. Wash goggles thoroughly with soap and water before someone else wears them.
- TM 3-34.46 (3 May 2013), para 13-19
- 12R deep dive: What ladder rules apply to electrical work?
- Ladders must be in good condition, constructed safely, and unpainted. Never use a metal ladder when working on electrical equipment. Do not paint wooden ladders. Place the base about one-quarter the length of the ladder from the vertical support, fully open a stepladder before using it, do not reach out from the ladder, and do not use a ladder in a strong wind. Anchor the ladder with a rope or chain, place it against a projection, or have an assistant stand at the base. Use a safety strap when the job requires both hands.
- TM 3-34.46 (3 May 2013), para 13-21
- 12R deep dive: Under what conditions may an electrician work on energized conductors at 300 volts or less?
- Electricians may work on energized conductors and equipment operating at 300 volts or less if all adjacent energized or grounded conductors and equipment are covered with insulating material or approved rubber protective equipment. Tape or cover all bare or exposed places on one conductor before exposing another one. Open switches and remove fuses when working on building wiring or machinery, and attach hold cards to the switches. Do not touch steam or water pipes when handling portable electric tools or light cords. Never leave joints or loose ends of wire untaped unless otherwise protected.
- TM 3-34.46 (3 May 2013), para 13-34
- 12R deep dive: Should electrical installation work be done on a live circuit, and how is a circuit de-energized?
- Do all electrical installation work on a de-energized (dead) circuit if possible. Most electricians trip the main service-entrance switch, remove the fuses, and then tag the switch with the electrician's name, the date, and the time the switch was turned off. If that is not possible, de-energize the circuit being repaired or modified by removing the branch-circuit fuses or tripping the branch circuit breaker to OFF.
- TM 3-34.46 (3 May 2013), para 13-40
- 12R deep dive: How low a voltage can cause death by electrocution, and what rules apply if hot-circuit work is unavoidable?
- Working on hot circuits is not recommended except in emergencies, and then only by experienced personnel who have been cautioned on the dangers. AC voltages as low as 67 volts and DC voltages as low as 110 volts have caused death by electrocution. Insulate yourself so your body is not a conductor path, work on only one side of the circuit at a time, use insulating gloves at all times and stand on nonconducting materials, and ensure that equipment, tools, and clothing are dry.
- TM 3-34.46 (3 May 2013), para 13-41
- 12R deep dive: How should fuse or breaker ampere rating be selected for a circuit?
- Limit the ampere rating to the maximum value allowable for the smallest conductor or equipment used in the circuit. For example, if a device has a 15-ampere fusible rating and it is connected to a circuit wired with No. 12 conductors rated at 20 amperes, the fusing of the circuit should be 15 amperes.
- TM 3-34.46 (3 May 2013), para 13-42
- 12R deep dive: What should a 12R do if fuses blow or circuit breakers trip frequently?
- Frequently blown fuses or tripped breakers indicate short circuits, grounding, or circuit overloads. Do not solve the problem merely by installing larger fuses than those recommended for the circuit, because that exposes the building and personnel to an electrical fire. Determine the cause and rewire overloaded circuits by increasing the wire size of the run or dividing the connected load into several circuits.
- TM 3-34.46 (3 May 2013), para 13-43
- 12R deep dive: May jumpers be used to bypass a fuse or circuit breaker?
- No, except when testing for short circuits. If these protective devices are bypassed, the installation loses its circuit-current limitation and short-circuit protection. If they are removed, the trouble will not be isolated to the local circuit and can cause the rest of the fuses to blow or the breakers to operate, cutting off the entire system.
- TM 3-34.46 (3 May 2013), para 13-44
- 12R deep dive: How must grounded, ungrounded, and grounding conductors be color-coded?
- A grounded or neutral conductor is identified by an outer color of white or neutral gray for No. 6 wire or smaller; larger conductors can be identified by white or neutral gray or by white markings at the terminals. Ungrounded conductors should be identified with insulation colored black, red, and blue and used in that order in two-, three-, or four-wire circuits. All circuit conductors of the same color must be connected to the same hot feeder conductor throughout the installation. A grounding conductor used solely for grounding should be bare or have a green covering.
- TM 3-34.46 (3 May 2013), para 1-12
- 12R deep dive: Where are splices permitted, and may they be pulled through conduit?
- A spliced wire must be as good a conductor as a continuous conductor. Splices should be avoided whenever possible, but they are permitted if they are located inside an electrical box. The best practice is to run continuous wires from the service box to the outlets. Under no conditions should splices be pulled through conduit; they must be placed in appropriate electrical boxes so that the hot wire will not come into contact with the grounding system.
- TM 3-34.46 (3 May 2013), paras 1-13 and 1-15 (including DANGER)
- 12R deep dive: What is the smallest wire size permitted in interior wiring, and what is the minimum gauge for service-wire installation?
- No. 14 wire is the smallest wire size permitted in interior wiring systems. The minimum gauge for service-wire installation is No. 8. Service-wire sizes are increased because they must meet the voltage-drop requirement and be strong enough to support their own weight plus additional loading from ice or branches.
- TM 3-34.46 (3 May 2013), paras 3-25 and 3-27
- 12R deep dive: What voltage-drop limits apply to branch circuits and feeders?
- The conductor size for branch circuits should be such that the voltage drop will not exceed 3 percent to the farthest outlet for power, heating, or lighting loads. The maximum voltage drop for feeders is also 3 percent, provided that the total voltage drop for both feeder and branch circuit does not exceed 5 percent.
- TM 3-34.46 (3 May 2013), para 3-26
- 12R deep dive: When must the neutral conductor be grounded?
- The neutral conductor must be grounded on all electrical systems if the voltage between the hot lead and the ground is less than 150 volts. In addition, all systems should have a grounded neutral where the voltage to ground does not exceed 300 volts. Interior circuits operating at less than 50 volts need not be grounded if the transformer supplying the circuit is connected to a grounded system.
- TM 3-34.46 (3 May 2013), para 3-28
- 12R deep dive: How is a system ground provided at a building service entrance?
- Place a No. 6 copper (or No. 4 aluminum) wire between the neutral wire, service box, bonding wire, and a grounding electrode at the building’s service entrance. The electrode may be a buried water pipe, the metal frame of a building, a local underground system, or a fabricated device. If more than one electrode is used, they must be placed a minimum of 6 feet apart.
- TM 3-34.46 (3 May 2013), para 3-31
- 12R deep dive: When must a water-piping system be used as the grounding electrode?
- An underground water piping system will always be used as the grounding electrode if such a piping system is available. If the piping system is less than 10 feet deep, supplemental electrodes will be used. Interior metallic cold-water piping systems will always be bonded to the grounding electrode or electrodes.
- TM 3-34.46 (3 May 2013), para 3-32
- 12R deep dive: What size and burial rules apply to plate and pipe grounding electrodes?
- Each plate electrode must have at least 2 square feet of surface exposed to the soil. Iron or steel plates must be at least 1/4 inch thick, and nonferrous metal at least 0.06 inch thick. Plates should be buried below the permanent moisture level if possible. Clean metallic pipe or conduit at least 3/4-inch trade size may be used; each pipe must be driven to a depth of at least 8 feet, or if that cannot be done it may be buried in a horizontal trench and must be at least 8 feet long.
- TM 3-34.46 (3 May 2013), paras 3-33 and 3-34
- 12R deep dive: What size is required for rod electrodes, and what is the standard military ground rod?
- Rod electrodes of steel or iron must be at least 3/8 inch in diameter. Rods of nonferrous material must be at least 1/2 inch in diameter. The standard ground rod for the military is a 5/8-inch steel rod with three sections of 3 feet each. Installation of rod electrodes is the same as for pipe electrodes.
- TM 3-34.46 (3 May 2013), para 3-35
- 12R deep dive: What resistance to ground should electrodes have, and how is it tested?
- Electrodes should have a resistance to ground of 25 ohms or less. Underground piping systems and metal frames of buildings normally have resistance to ground of less than 25 ohms. Burying an electrode below the permanent moisture level of the soil normally reduces the resistance to acceptable values. Grounding systems should be tested with a Megger ground tester, which may be found in organizations such as the installation’s Department of Public Works or engineer division.
- TM 3-34.46 (3 May 2013), para 3-36
- 12R deep dive: What voltage should exist between the grounded conductor and the grounding electrode system?
- The voltage between the neutral or grounded conductor of a grounded system and the ground (water pipes, metal frames of buildings, ground rods) should be zero at all times. The detection of any voltage indicates a faulty wiring system.
- TM 3-34.46 (3 May 2013), para 3-37
- 12R deep dive: What is bonding, and where is the ground or neutral conductor attached to the bonding circuit?
- Bonding provides a continuous, separate electrical circuit between all metallic circuit elements (conduit, boxes, and so forth) and the service-entrance ground. The ground or neutral conductor is attached to the bonding circuit only at the service entrance. At that point, the neutral wire and a bonding wire from the service box are attached to the grounding electrode. Nonmetallic conduit or cable must have a conductor in it to provide this bonding circuit, and that conductor should be attached to the metal boxes or fixtures where the cable or conduit terminates.
- TM 3-34.46 (3 May 2013), para 3-38
- 12R deep dive: When must a jumper be used between a receptacle’s equipment-ground terminal and the box?
- All metal-to-metal connections must be tight to ensure a continuous bonding circuit. When continuity is doubtful, use a wire jumper between the two metal pieces. For example, if a box is recessed to obtain a flush receptacle, the connecting screws are used as adjusting screws and are not tightened, so a wire must be placed between the box and the equipment-ground terminal of the receptacle (the green wire). Proper bonding prevents shocks from metal surfaces of an electrical system.
- TM 3-34.46 (3 May 2013), para 3-39
- 12R deep dive: Why do safety codes require grounding on every 120-volt circuit?
- Safety codes require that every 120-volt circuit have a system of grounding. During normal operation the grounding system does nothing; in the event of a malfunction, the grounding is there for protection.
- TM 3-34.46 (3 May 2013), para 13-49
- 12R deep dive: How many amperes per circuit are allowed on a 20-ampere, 120-volt branch circuit, and what is the maximum wattage?
- 80 percent of the 20-ampere rating, or 16 amperes per circuit, is allowed. The maximum wattage permitted on each such circuit is 16 times 120, or 1,920 watts. For example, an 18,000-watt connected load divided by 1,920 shows that 9.375 circuits are required, so ten 20-ampere circuits should be used, because only whole circuits are allowed.
- TM 3-34.46 (3 May 2013), paras 3-15 and 3-16
- 12R deep dive: How is the number of branch circuits determined, and which loads are left off that calculation?
- Add the connected load in watts and divide the total by the wattage permitted on the size of branch circuit selected. This method should not include special heavy loads such as air conditioners that require separate circuits.
- TM 3-34.46 (3 May 2013), para 3-14
- 12R deep dive: How should outlet load be figured when blueprints do not list special or appliance loads?
- For heavy-duty outlets or mogul-size lamp holders, figure the load at 5 amperes each. For all other outlets, both ceiling and wall, compute the wattage drain at 1.5 amperes per outlet.
- TM 3-34.46 (3 May 2013), para 3-10
- 12R deep dive: How much extra load should be allowed for fluorescent-light ballasts?
- When fluorescent lights are specified, increase the wattage drain (load per outlet) approximately 20 percent to provide for the ballast load. For example, a two-lamp, 40-watt fixture has an actual wattage drain of 80 watts plus about 16 watts for both lamp ballasts, or a total load of 96 watts.
- TM 3-34.46 (3 May 2013), para 3-8
- 12R deep dive: What is 60-cycle current?
- A cycle is the change from positive to negative and back again to positive. This usually takes place 60 times every second, and such current is then known as 60-cycle current. Sixty times every second each wire is positive, 60 times every second each wire is negative, and 120 times every second there is no voltage at all on the wire. The voltage is never constant but is always gradually changing from zero to maximum, with the average being about 120 volts.
- TM 3-34.46 (3 May 2013), para 3-22
- 12R deep dive: How high are wall switches usually mounted, and where are they placed at a doorway?
- Wall switches are usually located on the latch side of doorways or the traffic side of arches or other wall openings. They are mounted approximately 48 inches from the floor. Areas with more than one entrance will have a multiple-control wall switch at each principal entrance, unless that would place switches within 10 feet of each other. Hallways require a switch at each doorway leading into the hall, mounted on the latch side. Stairways should have at least one switch-controlled lighting outlet, with switches at each landing where a doorway provides access.
- TM 3-34.46 (3 May 2013), para 3-17
- 12R deep dive: How far apart should general-purpose receptacle outlets be placed, and at what height?
- Each kitchen, family room, dining room, living room, library, den, bedroom, or similar room will have receptacle outlets every 6 feet and near the ends of walls where possible. Unless otherwise specified, receptacle outlets should be placed approximately 12 inches from the floor. Hallways that are 10 feet long or longer will have at least one receptacle outlet, with hallway length measured along the centerline without passing through a doorway.
- TM 3-34.46 (3 May 2013), para 3-17
- 12R deep dive: What special circuit and receptacle rules apply in kitchens and dining areas?
- Each kitchen, pantry, breakfast room, dining room, or similar room should have two or more 20-amp appliance circuits that serve all receptacle outlets in those rooms; outlets in other rooms are not to be connected to these circuits. In kitchens and dining areas, install a receptacle outlet along counter-top space every 4 feet. Counter space separated by a range top, a refrigerator, or a sink is considered a separate counter. Outlets will not be installed in a face-up position in the counter top. Any receptacle outlet within 6 feet of a sink must be protected by a GFCI.
- TM 3-34.46 (3 May 2013), para 3-17
- 12R deep dive: What receptacle requirements apply to bathrooms, grade-level exteriors, and laundry areas?
- Bathrooms will have at least one wall-mounted receptacle outlet at each basin, and all bathroom receptacles must be GFCI-protected. Install at least one receptacle outlet on the front and one on the back of each building, and all receptacle outlets within grade-level access will be GFCI-protected. Laundry areas will have at least one receptacle outlet, wired for 20-amp service, with no other outlets connected to that circuit. If the laundry equipment is in the basement or garage, at least one additional receptacle outlet must be provided.
- TM 3-34.46 (3 May 2013), para 3-17
- 12R deep dive: How is a wire nut connected?
- Strip off about 1 inch of insulation from the ends of the wires, and twist the stripped ends clockwise at least one and one-half turns. Snip 3/8 to 1/2 inch off the twisted wires so the ends are even, then screw the wire nut on clockwise. Solderless connectors, popularly called wire nuts, are used for connecting small-gauge and fixture wires.
- TM 3-34.46 (3 May 2013), paras 1-14 and 1-15
- 12R deep dive: What is required for a good soldered splice?
- When a solderless connector is not used, the splice must be soldered before it is considered as good as the original conductor. The primary requirements are a clean soldering iron, a clean joint, and a nonacid flux, satisfied by using pure rosin on the joint or a rosin-core solder. Apply the iron to the joint until the joint melts the solder by its own heat. When soldering, always work from above or the side to prevent burns from splashing solder, and wear goggles when soldering large joints and tinning lugs or T connectors. Never put a cold or wet ladle or other objects in molten solder or hot compound, because spattering results.
- TM 3-34.46 (3 May 2013), paras 1-16 and 13-9
- 12R deep dive: If the service is single-phase with three wires, what voltages should a voltmeter show?
- Two of the conductors are hot, and the third is ground. A voltmeter reading between the two hot conductors will be twice as great as the reading between either hot conductor and the neutral or ground conductor. If the service is three-phase, the voltage between any two of the conductors is the same. Normally, one of the conductors is grounded to establish a ground reference voltage for the system.
- TM 3-34.46 (3 May 2013), para 3-3
- 12R deep dive: Where may armored-cable wiring be used, and when is lead-covered cable required?
- Armored-cable wiring is permissible for all interior installations except where it is exposed to saturation by liquid or where it is in contact with acid fumes. In wet areas, a lead-covered cable is required. Armored cable generally costs more than Type NM cable but gives greater mechanical-damage protection.
- TM 3-34.46 (3 May 2013), para 4-1
- 12R deep dive: How often must armored cable be supported, and how should it be run through structural members?
- When running armored cable between joists and studs, support it with staples or straps at least every 4 1/2 feet and also within 12 inches of each box entry, unless the support would interfere with an installation that requires extreme flexibility. Whenever possible, run it through holes centrally drilled in the structural members, at least 1/8 inch oversize. Avoid notching joists and studs for flush mounting, because that exposes the cable to nails and weakens the structural member. When runs across the bottom of ceiling joists and stud faces are at least 7 feet above the floor, support them on each joist or stud.
- TM 3-34.46 (3 May 2013), paras 4-6 and 4-7
- 12R deep dive: When must guard strips be used with armored cable?
- When installing armored cable on the top of ceiling joists or studs in accessible locations such as attics and temporary buildings at a distance of less than 7 feet from the floor, install guard strips at least as high as the cable.
- TM 3-34.46 (3 May 2013), para 4-8
- 12R deep dive: Why must an antishort bushing be inserted at a cut end of armored cable?
- After the armor is cut and the outer burred edges are filed, the inner edges are always sharp and jagged. If they are not covered, they tend to puncture the wire insulation and cause short circuits and grounds. Insert a tough fiber bushing, commonly called an antishort bushing, between the armor and the wire.
- TM 3-34.46 (3 May 2013), para 4-14
- 12R deep dive: Where may armored cable be spliced or connected to devices?
- Only in standard junction or outlet boxes. Cut all cable long enough to run from box to box. Thread the cable through the mounting holes, attach it to one box, take the slack out with just enough force to maintain the proper bends, then cut the cable from the roll and connect it to the other box. The bonding wire runs the entire length of the cable and must be bonded to the enclosure; bend the wire back over the cable before installing the connector or attaching it to a box with an internal clamp.
- TM 3-34.46 (3 May 2013), paras 4-10 and 4-17
- 12R deep dive: May the white conductor in armored or nonmetallic-sheathed cable be used as a hot wire at a switch?
- Yes. One of the conductors of armored cable is always white. Because of this color coding, the white wire in a switch installation, for both armored cable and nonmetallic-sheathed cable, can be used as a hot wire and be connected to a black wire.
- TM 3-34.46 (3 May 2013), para 4-3
- 12R deep dive: Where is Type NM cable approved, and where must it not be installed?
- Type NM is approved for use in concealed or exposed, dry, indoor locations and is recommended where a good system ground is not available. It is not approved for embedded installation in masonry, concrete, fill, or plaster. Do not install Type NM cable in potentially dangerous areas where wire damage may occur, such as commercial garages, theaters, storage-battery rooms, or hoistways, and do not use it in humid or wet areas, such as ice plants or cold-storage warehouses.
- TM 3-34.46 (3 May 2013), para 4-22 (including WARNING)
- 12R deep dive: How does Type NMC cable differ from Type NM?
- Type NMC is a dual-purpose, plastic-sheathed cable with solid-copper conductors. It needs no conduit, resists moisture, acid, and corrosion, and can be run through masonry and between studding. Its flat shape and gray or ivory color make it ideal for surface wiring. Type NM consists of rubber- or thermoplastic-covered wires in two- or three-wire combinations, with a bare copper wire used for bonding.
- TM 3-34.46 (3 May 2013), paras 4-23 and 4-24
- 12R deep dive: What is the minimum bend radius for Type NMC cable, and must cable runs be continuous?
- To prevent damage to the sheathing on Type NMC cable, the minimum allowable radius of bends is five times the cable diameter. Cable runs must be continuous from outlet to outlet because wire splices are only permitted inside a box. When removing the protective sheathing from Type NM cable for a box connection, use an electrician's knife instead of a hacksaw, and cut a slit in the sheathing parallel to the wires without touching the individual wire insulation. A cut about 8 inches long is satisfactory for ordinary boxes.
- TM 3-34.46 (3 May 2013), paras 4-29 and 4-30
- 12R deep dive: How much cable should be left inside a metal box, and must fished cable be supported?
- Cable must be secured to a metal box with built-in cable clamps or a separate cable connector, and 6 to 8 inches of cable should extend into the box for connections. When fishing cable behind walls, above ceilings, or under floors, you are not required to support the cable, but you must clamp the cable to the box.
- TM 3-34.46 (3 May 2013), paras 4-33 and 4-37
- 12R deep dive: Must a nonmetallic box be grounded?
- No. Since nonmetallic boxes do not conduct electricity, they need not be grounded. Treatment of the grounding wire is based on whether the box holds a receptacle, a switch, or a light fixture.
- TM 3-34.46 (3 May 2013), para 4-38
- 12R deep dive: When cable is run across the top of a floor or joist, how must it be protected?
- Protect it with guard strips that are at least as high as the cable. In a location not normally used, such as an attic or a crawl space, damage-protection devices such as guard strips are required only within 6 feet of the entrance. If possible, do not install concealed cable near baseboards, door and window casings, or other likely locations of trim, because of damage from nails. If thermal insulation is installed where cable is in place, use only noncorrosive, noncombustible, nonconductive insulation, and avoid adding strain on the cable, its supports, or its terminal connections.
- TM 3-34.46 (3 May 2013), para 4-28
- 12R deep dive: Why are circuit breakers preferred over fuses, and what must each branch circuit have?
- Circuit breakers are preferred because they can be manually reset after tripping, while fuses must be replaced. Fuses can easily be replaced with higher-capacity ones that do not protect the circuit, but this is difficult to do with circuit breakers. Circuit breakers combine the functions of a fuse and a switch. When tripped by overloads or short circuits, all of the ungrounded conductors of a circuit are opened simultaneously. Each branch circuit must have a fuse or circuit breaker protecting each ungrounded conductor.
- TM 3-34.46 (3 May 2013), para 2-82
- 12R deep dive: Why should a fuse puller be used with cartridge fuses?
- The fuse puller is designed to eliminate the danger of pulling and replacing cartridge fuses by hand. It is also used for bending fuse clips, adjusting loose cutout clips, and handling live electrical parts.
- TM 3-34.46 (3 May 2013), para 2-3
- 12R deep dive: What tape is preferred in the field for 120- to 600-volt circuits?
- Plastic electrical tape, which has adhesive on one face. It has replaced friction and rubber tape in the field for 120- to 600-volt circuits and is preferred because it serves a dual purpose in taping joints.
- TM 3-34.46 (3 May 2013), para 2-20
- 12R deep dive: What nominal voltages does the United States use for single-phase AC low-voltage distribution?
- Nominal voltages that range from 120 to 240 volts. Though these are considered standard because of their prevalent use, some locations still have DC systems or use AC systems with nonstandard voltages. Many countries employ voltages other than those accepted as standard, so equipment may have to be converted, modified, or operated inefficiently when powered by foreign electrical installations. All equipment should be operated at its rated voltage.
- TM 3-34.46 (3 May 2013), paras 6-2, 6-3, and 6-11
- 12R deep dive: What happens if fluorescent or incandescent lamps are operated at the wrong voltage or at 50 cycles?
- When fluorescent lamps are operated at voltages higher than standard, both lamp and ballast life are shortened. Line voltages below the operating range cause uncertain starting, short lamp life, and reduced lighting efficiency. Fluorescent lights rated for 60-cycle current can be used at 50 cycles, but they will have a shorter ballast life, and at lower than 60-cycle frequencies a noticeable flicker can be seen; operation at lower frequency is not satisfactory and should be avoided. Incandescent lamps operated above their normal ratings of 115, 120, and 125 volts have a shortened life and increased light output; if voltage is below standard, lamp life increases and lighting efficiency is reduced about 3 percent for each 1 percent drop in rated voltage. Resistance devices such as heaters operate efficiently over all distribution frequencies used in the United States and foreign territories.
- TM 3-34.46 (3 May 2013), paras 6-12 and 6-13
- 12R deep dive: Why should dissimilar metals not be joined in a power-distribution system?
- Dissimilar metals should never be used together except in an emergency expedient installation. Close association of dissimilar metals can cause galvanic corrosion at the joints, which would eventually destroy the usefulness of the equipment. This is a particular concern when aluminum and copper are joined. New materials marked for connection to copper or aluminum are available. If aluminum is used exclusively in a system, a special joint compound must be applied to all connections or joints, because the oxide of an aluminum conductor adds a high contact resistance.
- TM 3-34.46 (3 May 2013), para 6-14
- 12R deep dive: What are the advantages of rigid metal conduit, and where may enameled conduit be used?
- Black-enamel or galvanized rigid metal conduit is approved for use under most conditions and in most locations. Metal conduit and fittings protected from corrosion by enamel may only be used indoors and in areas that are not subject to severe corrosion. Rigid conduit is generally the most expensive type of wiring installation, but its strength permits installation without running boards, it can carry more conductors in one run than other systems, and its rigidity permits installation with fewer supports. The size usually provides for adding several more conductors when additional circuits and outlets are required in the run.
- TM 3-34.46 (3 May 2013), para 5-1
- 12R deep dive: How does rigid conduit differ from water pipe, and what standard sizes are used in interior wiring?
- Conduit has the same size designations as water pipe, but it is softer and can be bent fairly easily, its inner surface is smooth to prevent damage to wires being pulled through it, and its finish is rust-resistant. The size is determined by the inside diameter. Standard conduit sizes used in interior wiring are 1/2, 3/4, 1, 1 1/4, 1 1/2, 2, and 2 1/2 inches. Conduit smaller than 1/2 inch can only be used in finished buildings where extensions are to be made under plaster; in those installations, 5/16-inch conduit or tubing is permitted. Black-enamel conduit is used for dry and indoor installations, and galvanized conduit is used in outside installations.
- TM 3-34.46 (3 May 2013), paras 5-3 and 5-4
- 12R deep dive: What limits apply to field bends in rigid conduit?
- Bends must be made without collapsing the conduit wall or reducing the internal diameter at the bend. The radius of the curve on the inner edge of any field bend must be at least six times the internal diameter of the conduit for rubber-, braid-, or thermoplastic-covered conductors and at least 10 times the internal diameter for lead-covered conductors. A maximum of four quarter bends can be placed in a conduit run between two openings, and a 10-foot length of conduit should have no more than three quarter bends.
- TM 3-34.46 (3 May 2013), para 5-14
- 12R deep dive: What must be done after cutting conduit, before it is installed?
- A sharp edge always remains inside the conduit after cutting. Before installing the conduit, remove this edge with a pipe reamer or a file to avoid conductor damage. This process is called reaming.
- TM 3-34.46 (3 May 2013), para 5-20
- 12R deep dive: How should conductors be pulled into a conduit run, and may splices be concealed in the conduit?
- For short runs with few wires, conductors can be paired and pushed through from box to box. When the run has several bends and more than two conductors, use a fish tape, and tape the conductor junction to the fish tape. Wire pulling is generally a two-person procedure: one pulls while the other feeds, keeping the wires in the same relative position to avoid insulation injury. A wire lubricant such as powdered soapstone may be used. Do not make any wire splices that will be concealed in the conduit runs, because splices reduce the pulling area and could be a source of electrical failure.
- TM 3-34.46 (3 May 2013), paras 5-24, 5-25, and 5-26
- 12R deep dive: In conduit wiring, may the white (grounded) conductor be fused, switched, or connected to a black wire?
- No exceptions to standard color coding are permitted in conduit wiring. Never connect the white wire to a black or substitute-color wire. You must not fuse or switch the white wire except in a multipole device that opens all conductors of the circuit simultaneously. The white wire is always the grounded neutral. Black wires are the hot leads that are fused and connected to the switch when controlling power to a lampholder or an outlet. A green insulated conductor denotes a wire used to provide an auxiliary grounding path.
- TM 3-34.46 (3 May 2013), para 5-28
- 12R deep dive: What is electrical metallic tubing (EMT), and where should it be used?
- EMT, commonly called thin-wall conduit, is metallic tubing that can be used for exposed or concealed electrical installations. Its use should be confined to dry interior locations because it has a very thin plating that does not protect it from rusting when exposed to the elements or humid conditions. It is less expensive than rigid conduit, easier to install, does not have to be threaded, and is most generally specified for home-building construction. It has a thinner wall than rigid conduit but the same interior diameter, and it is available in sizes from 3/8 to 2 inches. Use the 3/8-inch size only for under-plaster extensions. All couplings and connections to boxes are threadless and are of clamp or compression type.
- TM 3-34.46 (3 May 2013), paras 5-34 and 5-35
- 12R deep dive: What is flexible metal conduit (Greenfield) used for, and how must it be grounded and supported?
- Greenfield resembles armored cable but is more adaptable because various sizes and numbers of wires can be pulled into it after it is installed. Its cost limits its use to connections between rigid wiring systems and movable or vibrating equipment such as motors or fans, or where a difficult conduit bend is required. Most flexible conduit systems must be grounded by running a separate grounding wire with the circuit conductors. Runs between boxes and fittings must not bend more than the equivalent of four quarter turns. Support it with a conduit strap within 12 inches of every box or fitting and at intervals no longer than 4 1/2 feet.
- TM 3-34.46 (3 May 2013), paras 5-41, 5-42, 5-43, and 5-44
- 12R deep dive: What type of nonmetallic conduit is most commonly used, and how is it joined and grounded?
- Schedule 40 polyvinyl chloride (PVC) is the one most electricians use. It may be used in wet or dry locations, in walls, in ceilings, and above or below the ground. Do not substitute PVC irrigation pipe for schedule 40 PVC conduit; look for the insignia of an electrical materials testing laboratory. Nonmetallic conduit does not constitute a grounded system, so you must run a separate grounding wire with the circuit conductors. After cutting PVC, trim the ends inside and out to remove rough edges. Bend it by heating it in a special infrared heater until soft; do not heat it with a torch. PVC comes in 10-foot lengths; glue it with gray conduit cement, not water-pipe cement. No piece between fittings should bend more than the equivalent of four quarter turns.
- TM 3-34.46 (3 May 2013), paras 5-45, 5-46, 5-47, 5-48, and 5-49
- 12R deep dive: Which receptacles may be used with aluminum wire?
- Receptacles marked CO-ALR can be used with either copper or aluminum wire. Unmarked receptacles and those marked CU-AL may be used with copper wire only.
- TM 3-34.46 (3 May 2013), para 2-65
- 12R deep dive: What must be installed at every power-line entry to a building, and is the neutral switched?
- A switch-and-fuse combination or a circuit-breaker switch must be installed at the service entrance. This switch must be rated to disconnect the building load while in use at the system voltage. Entrance switches consist of one knife-switch blade for every hot wire of the power supplied. The blades are operated simultaneously through an exterior handle. The neutral or grounded conductor is not switched but is connected at a neutral terminal within the box.
- TM 3-34.46 (3 May 2013), para 2-73
- 12R deep dive: When is a cartridge fuse used instead of a plug fuse, and when should a time-lag fuse be used?
- The cartridge-type fuse is used for current ratings above 30 amperes in interior wiring systems. The ordinary plug or screw-type fuse is satisfactory for incandescent lighting or heating-appliance circuits. Whenever motors are connected on branch circuits, time-lag fuses should be used instead of the standard plug or cartridge-type fuse, because they hold the circuit during a momentary heavy ampere drain (such as motor starting) yet still cut out the circuit under normal short-circuit conditions.
- TM 3-34.46 (3 May 2013), paras 2-75 and 2-76
- 12R deep dive: When is a separate main disconnect required ahead of the branch circuit breakers?
- A main breaker or switch is not required ahead of the branch circuit breakers if fewer than six movements of the hand are required to open all the branch circuit breakers. If more than six movements of the hand are required, a separate disconnecting main circuit breaker is required ahead of the branch circuit breakers. Each 120-volt circuit requires a single-pole breaker. Each 240-volt circuit requires a double-pole breaker to protect both ungrounded conductors.
- TM 3-34.46 (3 May 2013), para 2-83
- 12R deep dive: How does a 40-watt fluorescent tube compare with a 40-watt incandescent bulb?
- Bulb for bulb and watt for watt, a fluorescent light provides more light for the money than an incandescent light. A 40-watt fluorescent tube produces almost six times as much light as a 40-watt incandescent bulb, and a fluorescent tube will last about five times longer than an incandescent bulb.
- TM 3-34.46 (3 May 2013), para 2-88
- 12R deep dive: Boxes used in wet or hazardous locations must have what kind of hubs for rigid conduit?
- Boxes that are used in wet or hazardous locations must have threaded hubs into which the conduit is screwed. Steel or cast-iron outlet boxes used in rigid-conduit installations are normally supplied with knockouts, and bushings and locknuts are provided for attaching the conduit to the boxes.
- TM 3-34.46 (3 May 2013), para 5-8
- 12R deep dive: For underground or wet conduit installations, what type of cable is required?
- Underground or wet installations require the insertion of lead-covered cables in galvanized conduit for permanent protection. Rubber-covered Types R and RH wire are used with conduit in most interior wiring installations, but thermoplastic Types T and TW are gaining favor because of their superior insulating characteristics.
- TM 3-34.46 (3 May 2013), para 5-5
- 12R deep dive: What is a condulet used for in a rigid-conduit installation?
- Condulets are small junction or pull boxes. They provide intermediate points in long conduit runs for the pull-through of wire, or they provide junctions for several concealed installations where they will not be accessible. They are classified as Type SE (service entrance), Type L (elbow or turn fittings), Type C (through fittings), and Type T (through fittings with a 90-degree takeoff).
- TM 3-34.46 (3 May 2013), para 5-7
12R – Deep Dive: Hazardous Locations, Switches, Service Drops, Generators & Circuit Testing
Source: TM 3-34.46 (Theater of Operations Electrical Systems, 3 May 2013). Complements mos-12r-interior-electrician and mos-12r-3; does not repeat those cards. Verify current editions.
- 12R deep dive: Why must electrical power-generating equipment be grounded?
- Electrical power-generating equipment must be grounded. In the field, portable power-generating equipment may be grounded with a grounding rod, pipe, or plate. If it is not grounded, stray electrical current within the generator set or in the distribution system can injure or kill the operator and damage the equipment.
- TM 3-34.46 (3 May 2013), para 8-57 (including DANGER)
- 12R deep dive: May an air-cooled gasoline-engine generator set be operated inside a closed building?
- Never operate an air-cooled, gasoline-engine generator set inside a closed building unless forced ventilation can remove the engine heat and exhaust gases outside. Exhaust gases contain carbon monoxide, which is a poisonous, odorless, and colorless gas.
- TM 3-34.46 (3 May 2013), para 8-82 (WARNING)
- 12R deep dive: May a generator set be started with the circuit breaker closed, and what size ground wire is required?
- Never attempt to start a generator set with the circuit breaker closed (on). A closed circuit breaker will cause a power surge and damage the equipment. Ensure that the grounding connections on the equipment and the grounding rod are tight, and use No. 6 AWG or larger wire for the ground.
- TM 3-34.46 (3 May 2013), para 10-12 (including WARNING)
- 12R deep dive: What moisture precaution applies around a generator set?
- Keep the area surrounding a generator set dry at all times. If conditions are damp, use insulating materials around the set to avoid serious shocks. Keep electrical equipment dry to prevent corrosion, deterioration, and short circuits.
- TM 3-34.46 (3 May 2013), para 10-31 (including WARNING)
- 12R deep dive: How far from work areas must a generator fuel-storage area be, and what fire rules apply?
- Place the fuel storage area at least 50 feet from all work areas and equipment that does not require fuel, and at least 50 feet from heavily traveled roads. Clearly mark the area with NO SMOKING and OPEN FLAME signs. Do not place any electrical wires above or near the fuel tanks. Direct hot exhaust from operating engines away from the fuel supply. Prohibit burning of trash within 200 feet of any fuel storage area.
- TM 3-34.46 (3 May 2013), paras 10-8 and 10-10
- 12R deep dive: Why must a static capacitor be discharged before it is inspected or worked on?
- A static capacitor or condenser remains charged after being disconnected from the energy source, so you must not inspect it or work on it until it is completely discharged.
- TM 3-34.46 (3 May 2013), para 14-4
- 12R deep dive: After a circuit is de-energized, what must a 12R do before starting work?
- Recheck the circuit with an indicating instrument such as a test lamp or a voltmeter before starting work, even if you have already pulled the main switch, removed a circuit fuse, or tripped a local switch. The voltage rating of the test lamp should be twice the estimated voltage of the circuit. Check voltage by placing the test prods on the hot and neutral circuit wires at the fuse, the circuit-breaker panel, the device, or the outlet box where the work is to be done.
- TM 3-34.46 (3 May 2013), para 14-7
- 12R deep dive: What is a short circuit, and what is a grounded system in this context?
- A short circuit results when two bare conductors of different potential come in contact with each other—for example, if a hot wire touches something that is grounded, such as a neutral wire, a grounding wire, or a metal box. That can happen because insulation is damaged, a staple has penetrated the cable, or the wiring is incorrect. If a conductor inadvertently contacts a metallic part of a wiring system, such as a motor frame or conduit, the system is sometimes said to be grounded instead of having a short circuit. Grounds or short circuits can be solid, partial, or floating.
- TM 3-34.46 (3 May 2013), para 14-8
- 12R deep dive: When should a new wiring installation be tested?
- Test the circuit at the rough stage, while the wiring is still exposed and problems are easy to spot and correct. Switches, receptacles, and light fixtures are not installed at this stage, but hot, neutral, and grounding-wire splices should be made so that each circuit is continuous to the last box. Retest the circuit after installing walls, ceilings, and floors (before adding final touches), because a nail will occasionally penetrate the wiring and cause a short.
- TM 3-34.46 (3 May 2013), para 14-13
- 12R deep dive: What first-aid and artificial-respiration rules apply in an electrical shop?
- Ensure that the electrical shop and each of its trucks have adequately stocked first-aid kits. Treat minor cuts and injuries on the job, and ensure that serious cuts and injuries receive appropriate medical attention. Report all accidents to the foreman. Train personnel thoroughly in the prone-pressure and pole-top methods of applying artificial respiration, and the electrical foreman should schedule practice in artificial respiration once a month for every member of the electrical section.
- TM 3-34.46 (3 May 2013), para 13-7
- 12R deep dive: Who may remove a danger tag and restore service after work is complete?
- Once all the work is complete, the individual who initially installed the tag must remove the tag and restore service.
- TM 3-34.46 (3 May 2013), para 13-16
- 12R deep dive: What fire-safety rules apply to flammable liquids and waste in electrical work?
- Do not obstruct approaches to fire-fighting apparatus. Deposit all flammable waste materials in waste cans with self-closing covers and remove them at the end of the day. Keep flammable liquids in approved safety cans with self-closing covers, and do not store more than 1 gallon in each safety can inside a building. Never use flammable liquids to start a fire. Do not use gasoline as a cleaning agent; use a low-hazard solvent, preferably nonflammable. Never use a gasoline furnace or a blowtorch where flammable vapors are present.
- TM 3-34.46 (3 May 2013), para 13-6
- 12R deep dive: What are the three classes of hazardous locations?
- Special materials and procedures must be used where a spark could cause a fire or an explosion, such as hospital operating rooms and acetylene storage or production facilities. Class I includes areas where flammable gases or vapors are or may be present in the air in quantities sufficient to produce explosive or ignitable mixtures. Class II includes areas where combustible dust is present. Class III includes areas where easily ignitable fibers or filings are present but are not suspended in the air in sufficient quantities to produce ignitable mixtures.
- TM 3-34.46 (3 May 2013), paras 3-40, 3-41, 3-42, and 3-43
- 12R deep dive: How do Division 1 and Division 2 hazardous locations differ?
- Each class is subdivided into two divisions. In Division 1, the hazardous material is present in free air so that the atmosphere is dangerous. In Division 2, the hazardous material is in containers, and dangerous mixtures in the air occur only through accidents.
- TM 3-34.46 (3 May 2013), para 3-44
- 12R deep dive: What wiring is required in a Class I, Division 1 hazardous location?
- In Division 1 areas, wiring must be in threaded, rigid-metal conduit, with explosion-proof fittings or mineral-insulated, metal-sheathed (Type MI) cable. Division 2 areas may have flexible metal fittings, flexible metal conduit, or flexible cord that is approved for hard usage. All equipment such as generators, controllers, motors, fuses, and circuit breakers must be enclosed in explosion-proof housings.
- TM 3-34.46 (3 May 2013), para 3-46
- 12R deep dive: What wiring is required in Class II and Class III hazardous locations?
- In Class II, Division 1 areas, wiring must be in threaded rigid conduit or Type MI cable, with flexible metal conduit and threaded fittings where necessary. Equipment must be in dustproof cabinets, with motors and generators in totally enclosed fan-cooled housings. In Class II, Division 2 areas, electrical metallic tubing may also be used. In Class III, Division 1 areas, the same requirements exist as for Class I, Division 1. In Class III, Division 2 areas, open wiring is permitted, and motors and generators must be totally enclosed.
- TM 3-34.46 (3 May 2013), paras 3-47 and 3-48
- 12R deep dive: How must a one-pole switch be connected?
- A switch is used to connect and disconnect an electrical circuit from the source of power. Switches may be either one-pole or two-pole for ordinary lighting or receptacle circuits. If they are of the one-pole type, they must be connected to break the hot or ungrounded conductor of the circuit. If they are of the two-pole type, the hot and ground connection can be connected to either pole on the line side of the switch.
- TM 3-34.46 (3 May 2013), para 2-70
- 12R deep dive: When is a three-way switch used, and how can it be identified?
- A single-throw switch controls a light or a receptacle from only one location. When lights have to be controlled from more than one location, a double-throw switch, commonly called a three-way switch, is used. Three-way switches can be identified by a common terminal that is normally color-coded darker than the other terminals and located alone at the end of the switch housing. Either switch will open or close the circuit, turning the lights on or off.
- TM 3-34.46 (3 May 2013), para 3-52
- 12R deep dive: How is a light controlled from three locations?
- Two three-way switches plus a four-way switch will provide control at three locations. The switches must be installed with the four-way units connected between the two three-way units, and three-wire cable installed between the switches.
- TM 3-34.46 (3 May 2013), para 3-53
- 12R deep dive: How does a thermal circuit breaker work?
- A thermal circuit breaker has a bimetallic element that responds only to fluctuations in temperature within the circuit. The element is made by bonding together two strips of dissimilar metal, each with a different coefficient of expansion. Heat from current flow expands each metal at a different rate, causing the strip to bend. The breaker mechanism is adjusted so that the element bends just far enough under a specified current to trip the breaker and open the circuit.
- TM 3-34.46 (3 May 2013), para 2-79
- 12R deep dive: How does a magnetic circuit breaker differ from a thermal-magnetic breaker?
- A magnetic circuit breaker responds to changes in the magnitude of current flow; increased current creates enough magnetic force to pull up an armature and open the circuit. It is usually used in motor circuits for closer adjustment to motor rating, while the circuit conductors are protected by another circuit breaker. A thermal-magnetic circuit breaker combines both features. Practically all molded-case circuit breakers used in lighting panel boards are of this type: the thermal element protects against overcurrents in the lower range, and the magnetic element protects against the higher range usually occurring from short circuits.
- TM 3-34.46 (3 May 2013), paras 2-80 and 2-81
- 12R deep dive: How high must a service drop be attached, and how long may it be?
- Attach the service drop to the building where outlet wires can be tapped in easily without trailing along the building. Install the attachment at least 10 feet above the ground or 18 feet above a roadway. When the building is not high enough, install a riser or a pole to obtain proper clearance. Keep service drops less than 100 feet long for No. 8, 6, 4, or 2 wire. For No. 0 or larger wire, do not exceed 75-foot spans unless proper anchoring and support is provided. Long or large services should be guyed at the line pole.
- TM 3-34.46 (3 May 2013), paras 11-2 and 11-4
- 12R deep dive: What size of overhead service cable is recommended, and when is three-wire service required?
- Although No. 6 wire is recommended for overhead service cable, determine the size by the maximum demand load of electrical equipment used in each building. For two-wire service, the limit is two circuits in general-service buildings and four circuits or a 3-kilowatt connected load in barracks. Three-wire services are required for greater loads. Use three- or four-wire service to supply more than one service switch. When installing attachments and services, use insulated conductors. If an overhead service drop is impractical, run services underground from a transformer installation.
- TM 3-34.46 (3 May 2013), paras 11-1 and 11-3
- 12R deep dive: What is demand factor, and how is it applied in the warehouse example?
- Demand factor is the ratio of maximum demand to total connected load in a building, expressed as a percentage. In the TM example, if the connected load in a warehouse is 22,500 watts, take 100 percent of the first 12,500 watts (12,500) and 50 percent of the remaining 10,000 watts (5,000), for a total building load of 17,500 watts.
- TM 3-34.46 (3 May 2013), para 3-23, table B-14
- 12R deep dive: How may a generator distribution cable be installed, and how deep should a buried cable be?
- A distribution cable connects the generator set to the load and may be installed overhead, buried underground, or laid on the ground. Military systems use cable in predetermined lengths with quick-disconnect plugs, or building wire supplied in rolls. If the cable must be buried, dig a trench at least 18 inches deep, use only moistureproof cable, lay it on a sand cushion or a loosened trench base with rocks removed, allow at least 6 inches between cable centers, and cover it with earth that has no rocks or stones.
- TM 3-34.46 (3 May 2013), paras 10-14 and 10-17
- 12R deep dive: How are the terminals marked on an AC generator set’s load-terminal board?
- All AC generator sets are equipped with a load-terminal board that has four terminals marked L0, L1, L2, and L3. The terminals simplify connecting the distribution cable at the generator.
- TM 3-34.46 (3 May 2013), para 10-20
- 12R deep dive: What usually causes an open circuit, and how is it found?
- An open circuit is usually the result of an incorrect, loose, or missing connection at a box, and it can be spotted and corrected quickly after the device is installed and the service is turned on.
- TM 3-34.46 (3 May 2013), para 14-12
- 12R deep dive: What voltage can be measured across the terminals of a blown fuse when the load is disconnected?
- A full voltage can be measured across the terminals of a blown fuse when the load is disconnected from the circuit. Because the circuit resistance is very low and the current is very high, the fuse blows or the circuit breaker trips immediately.
- TM 3-34.46 (3 May 2013), para 14-9
- 12R deep dive: Why must the outlets in a building be divided into branch circuits, and how much of a circuit’s rating may be loaded?
- If all the power load were connected to a single pair of wires and protected by a single fuse, the entire establishment would be without power in case of a breakdown, a short circuit, or a fuse blowout, and the wires would have to be large enough to handle the entire load. Consequently, the outlets are divided into small groups known as branch circuits. Normally, the total load per circuit should not exceed 80 percent of the circuit rating.
- TM 3-34.46 (3 May 2013), para 3-12
- 12R deep dive: What must a 12R check at the service entrance before circuiting a building, and how is the type of service identified?
- The electrical power load cannot be properly circuited until the type and voltage of the central power-distribution system is known. The electrician should check the voltage and type of distribution at the power-service entrance to every building in which wiring is to be done, especially when altering or adding circuits. Voltage checks are usually made with an indicating voltmeter at the service-entrance switches or distribution load centers. The type of distribution is determined by a visual check of the number of wires entering the building. If only two wires enter, the service is either DC or single-phase AC.
- TM 3-34.46 (3 May 2013), paras 3-1 and 3-2
- 12R deep dive: What is a V-phase system, and how do its voltages compare?
- A V-phase system is the most common service for theater-of-operations construction. When three wires enter a building from an AC distribution system, the service can be single-phase, three-phase, or two ungrounded conductors and a neutral of a three-phase system (V-phase). In a V-phase system, the voltage between the two hot conductors will be 1.732 times greater than the voltage between either hot conductor and the neutral or ground.
- TM 3-34.46 (3 May 2013), paras 3-2 and 3-4
- 12R deep dive: How can a four-wire, three-phase service be identified with a voltmeter, and what are common operating voltages?
- Four-wire distribution denotes three-phase and neutral service. When tested, voltages between the neutral conductor and each of the three conductors should all be the same. The voltage readings between any two of these three wires are similar and should equal the neutral-to-hot-wire voltage multiplied by 1.732. Common operating voltages for this type of service are 120 and 208 volts or 277 and 480 volts.
- TM 3-34.46 (3 May 2013), para 3-5
- 12R deep dive: Why must both wires of an AC circuit travel in the same iron or steel conduit?
- When a conductor carrying current changes position or the current reverses direction, it induces a current in an iron or steel conduit carrying that conductor. If the conductor were isolated in the conduit, the conduit would be heated by the induced current, causing considerable power loss. In an AC system, both wires of a circuit are encased in a single conduit so that the induced currents balance and cancel each other. To eliminate induced heating, both wires of a circuit must travel in the same conduit.
- TM 3-34.46 (3 May 2013), para 5-31
- 12R deep dive: What warning applies when cutting armored-cable armor, and how should the cut be made?
- Avoid damaging the wire insulation or the metal bonding strip when cutting cable armor. Most electricians use a hacksaw. Place the blade at a right angle to the lay of the armor strip so that the hacksaw and the cable form two legs of a 60-degree triangle. When the blade has cut almost through the armor strip, bend the cable end back and forth until it breaks, then strip the loose armor and smooth rough or sharp ends with a file. When making an outlet connection, cut the cable about 8 inches longer on each end than required for the run, and cut the armor about 8 inches from the cable end so ample wire will be inserted in the box.
- TM 3-34.46 (3 May 2013), paras 4-11 and 4-12 (including WARNING)
- 12R deep dive: How does a continuity tester work, and what can it show?
- A battery provides the power source, and a light (or a doorbell on a homemade tester) provides a signal when the circuit is complete. Purchased testers may use a battery and a light, or a battery and a buzzer or a bell. Use either form to tell whether a circuit is open or broken or whether a short circuit exists. First check the wiring visually: start at the distribution center and walk through each circuit looking for problems, thinking about what each wire is supposed to do and verifying that the circuit is correctly wired.
- TM 3-34.46 (3 May 2013), paras 14-14, 14-15, and 14-18
- 12R deep dive: How is a single-motor installation circuited?
- Motors used on portable appliances are normally disconnected by removing the appliance plug or by operating a built-in switch. Some large-horsepower motors require a permanent power installation with special controls. Motor switches are rated in horsepower capacity. In a single-motor installation, a separate circuit must be run from the fuse or circuit-breaker panel to the motor, and individual fuses or circuit breakers must be installed.
- TM 3-34.46 (3 May 2013), para 3-18
- 12R deep dive: What kind of outlet boxes are generally used with conduit or armored cable in wet locations?
- Steel outlet boxes are generally used with rigid and thin-wall conduit or armored cable. They are either zinc- or enamel-coated; the zinc coating is preferred for conduit installation in wet locations. All steel boxes have knockouts sized to fit standard conduit fittings or cable connectors. Boxes designed specifically for armored cable also have integral screw clamps immediately inside the knockouts, which eliminate the need for cable connectors.
- TM 3-34.46 (3 May 2013), para 2-50
- 12R deep dive: Why must fellow workers be warned about dangerous positions, and what conduct is prohibited during electrical work?
- Warn fellow workers who get into dangerous positions. These warnings protect not only the person warned but also the rest of the crew, because some members may be less experienced and may not realize the danger. Avoid horseplay, wrestling, scuffling, practical jokes, and unnecessary conversation during duty hours. Electrical work is not dangerous when you take proper care, but it may become dangerous if your attention is distracted.
- TM 3-34.46 (3 May 2013), paras 13-2 and 13-3
- 12R deep dive: Why must an electrician be able to interpret blueprints?
- An electrician must be able to interpret simple blueprints, because construction orders are ordinarily in that form. He must also be able to make simple engineering sketches that describe work for which he receives only verbal orders.
- TM 3-34.46 (3 May 2013), para 1-6
- 12R deep dive: How does an incandescent-lighting dimmer typically operate?
- Electrical dimmers provide a full range of light from bright to dim for incandescent lighting. Special electronic dimmers exist for use with fluorescent lighting. A turn of the dial adjusts the brightness level, and a push-knob switch turns the light on or off without changing the brightness setting.
- TM 3-34.46 (3 May 2013), para 3-54
- 12R deep dive: How is a military grounding rod installed for a generator set if it cannot be driven below the moisture level?
- The standard grounding rod used by military units is a 5/8-inch copper rod with three 3-foot sections. Drive it at least 8 feet into the soil. The rod must be buried below the moisture level. If you cannot do this, replace the grounding rod with an 8-foot electrode. Bury the electrode in a horizontal trench that is at least 2 1/2 feet deep, and place the electrode below the moisture level.
- TM 3-34.46 (3 May 2013), para 8-58
- 12R deep dive: How should a generator distribution cable be protected when it is laid on the ground?
- Most cables are laid on the ground to save time. Protect the cable from mechanical damage by laying planks or logs on both sides of it so vehicles cannot drive directly on the cable. Lay the cable where it will have the least interference from personnel operations, and install warning signs indicating the cable location. Use only moistureproof cable that can withstand inclement weather.
- TM 3-34.46 (3 May 2013), para 10-18
- 12R deep dive: How is a homemade continuity tester made, and what warning applies before using any continuity tester?
- Use a doorbell and a 6-volt, dry-cell battery. Connect one battery terminal to one doorbell terminal with a short piece of wire, then connect a 2-foot wire to the other terminal on the doorbell. Momentarily touch the free wire end to the free battery terminal to test for correct connections; the doorbell should ring. Turn off the breaker or pull the fuse before using a continuity tester.
- TM 3-34.46 (3 May 2013), para 14-16 (including WARNING)
- 12R deep dive: How do you extend a continuity test to include wiring from a switch to the load it will control?
- Temporarily join the hot wires at each switch location. This simulates the ON position and thereby extends the circuit test to include the wiring from the switch to whatever it will control.
- TM 3-34.46 (3 May 2013), para 14-19
- 12R deep dive: How do you test each circuit for a short at the service-entrance panel with a continuity tester?
- At the service-entrance panel, hook one lead of the tester (the alligator clip of a continuity tester or the free wire of a homemade tester) to the neutral bus bar. Touch the hot wire of each circuit to the tester one at a time. The circuit should be open (no bell or light); if the light comes on or the bell rings, there is a short in that circuit.
- TM 3-34.46 (3 May 2013), para 14-20
- 12R deep dive: What type of receptacle is required on 15- or 20-amp, 120-volt branch circuits?
- Safety standards require that all receptacles for 15- or 20-amp, 120-volt branch circuits (most of the circuits in homes) must be the grounding type. Receptacles previously installed, as well as their replacements in the same box, may be two-wire receptacles. All others must be the three-wire type. The third wire on the three-wire receptacle is used to provide a ground lead to the equipment, guarding against dangers from current leakage due to faulty insulation.
- TM 3-34.46 (3 May 2013), para 2-64
- 12R deep dive: How should circuits be planned so the connected load is balanced?
- The ideal wiring system is planned so that each wiring circuit will have the same ampere drain at all times. Since this can never be achieved, the circuiting is planned to divide the connected load as evenly as possible. Thus, each circuit uses approximately the average power consumption for the total system, which makes for minimum service interruption.
- TM 3-34.46 (3 May 2013), para 3-20
- 12R deep dive: When may two or more motors be connected to the same branch circuit?
- Two or more motors may be connected to the same branch circuit, protected at not more than 20 amperes at 125 volts or less or 15 amperes at 600 volts or less, if each does not exceed 1 horsepower in rating and each does not have a full-load rating in excess of 6 amperes.
- TM 3-34.46 (3 May 2013), para 3-19
- 12R deep dive: How can a standard 1/2-inch conduit installation accommodate an increase from 15 to 20 amperes?
- A 1/2-inch conduit in a standard conduit wiring installation generally carries two No. 14 conductors, which have a 15-ampere capacity. The same conduit can also accommodate two No. 12 conductors, which have a 20-ampere capacity. If you are increasing the load in an existing circuit, you can use two No. 12 wires to replace the No. 14 wire. When you have replaced all the wires in the circuit, you can safely increase the amperage for the fuse or circuit breaker in the central fuse panel for the circuit from 15 to 20 amperes.
- TM 3-34.46 (3 May 2013), para 5-32, table B-19
- 12R deep dive: What preventive maintenance is required for conductor insulation?
- Ensure that preventive maintenance includes periodic tests and checks to expose potential trouble locations where the wire insulation has become frayed or where protective devices have been damaged. Tape, repair, or replace such wire areas and locations as required.
- TM 3-34.46 (3 May 2013), para 14-1
- 12R deep dive: How are one-piece and two-piece surface metal raceways installed?
- Surface metal raceways provide a quick, inexpensive wiring method because they are installed on the wall surface instead of inside the wall. With one-piece construction, electricians install the metal raceway like conduit, then pull the wires to make the necessary electrical connections. With two-piece construction, they install the base piece along the wiring run, lay the wiring in the base and hold it with clamps, then snap on the capping.
- TM 3-34.46 (3 May 2013), para 2-66
- 12R deep dive: Why must the fiber paper be removed from armored cable before installing an antishort bushing?
- The fiber paper that is twisted around the conductors before the metallic armor is attached must be removed to allow free wire movement. Normally, you can remove two or three turns of the paper from under the armor by using a jerking action to tear the loose paper away from the wire at the armor end. The free space between the armor and the wires facilitates mounting the antishort bushing.
- TM 3-34.46 (3 May 2013), para 4-13
- 12R deep dive: When should scaffolds be used instead of ladders for electrical work, and how should scaffold planks be tested?
- When the wiring location is inaccessible from normal work areas and the installation is large or complex, use scaffolds rather than ladders for overhead or elevated work platforms. All scaffolds should be sturdy, well-built, securely anchored, and cross-braced. Scaffold planking should be free of knots, checks, and cross-grained sections, and planks should be load-tested periodically with up to three times their workload. Do not use them if failure or weakness shows up in the test.
- TM 3-34.46 (3 May 2013), para 13-20
- 12R deep dive: What is the most accurate method of determining the load per lighting outlet?
- The most accurate method is to obtain the stated value from the blueprints or specifications. Commonly, the lighting outlets shown on the blueprints are listed in the specifications along with their wattage ratings. If the lights to be used are incandescent, this figure represents the total wattage of the lamp.
- TM 3-34.46 (3 May 2013), para 3-7
- 12R deep dive: What is a multioutlet system, and what is an over-floor metal raceway used for?
- A multioutlet system, with ground inserts if desired, has outlets spaced every few inches so that several tools or pieces of equipment can be used simultaneously. An over-floor metal raceway system handles telephone and signal or power and light wiring where the circuits must be brought to locations in the middle of the floor area. These systems can either be installed independently of other wiring systems or economically connected to existing systems.
- TM 3-34.46 (3 May 2013), para 2-67
12R – Thin Sections: Connectors & Contacts, and Safety & Risk
Source: TM 3-34.46 (Theater of Operations Electrical Systems, 3 May 2013). Complements mos-12r-interior-electrician, mos-12r-3, and mos-12r-4; does not remake those cards. Verify current editions.
- 12R deep dive: How is a three-prong plug fitted to a two-prong receptacle?
- Portable appliances are connected to receptacles by cords equipped with male plugs whose prongs mate with the slots in the outlet receptacles. A three-prong plug can fit into a two-prong receptacle by using an adapter. If the conductors connected to the outlet have a ground system, the plug on the lead wire of the adapter is connected to the center screw holding the receptacle cover to the box.
- TM 3-34.46 (3 May 2013), para 2-68
- 12R deep dive: What is a cord-connector body, or female plug, used for?
- In some operating conditions, a cord must be connected to a portable receptacle. This type of receptacle, called a cord-connector body or a female plug, is attached to the cord in a manner similar to the attachment of a male plug.
- TM 3-34.46 (3 May 2013), para 2-69
- 12R deep dive: How is an armored-cable connector attached to a box?
- First insert the cable in the connector and then tighten the holding screw, securely connecting the cable and connectors. Then insert the armored-cable connector through the box knockout opening, and secure it to the box with the locknut threaded on the connectors from inside the box.
- TM 3-34.46 (3 May 2013), para 4-15
- 12R deep dive: How is a cable connected to a box that has internal cable clamps?
- First remove the knockout at the point of entry. Next, loosen the clamp-holder screw, insert the cable through the knockout opening, and thread the leads through the clamp. Then force the armor snugly against the clamp end and retighten the clamp screw, forcing the clamp into the ridges of the cable.
- TM 3-34.46 (3 May 2013), para 4-16
- 12R deep dive: What slipping and tripping hazards should be kept out of a field work area or repair shop?
- Make every attempt to keep the work area in the field or the electrical repair shop free of materials and debris. Grease, oil, water, and similar material on the floor create slipping hazards that can cause serious injuries. Loose fittings, wire and conduit ends, and other debris stored or thrown at random on the floor in or around the job site create tripping hazards. Developing good housekeeping in and around the work area establishes good work habits that are carried over into wiring installation.
- TM 3-34.46 (3 May 2013), para 13-1
- 12R deep dive: What unusual conditions must be reported for safety, and may other work be stopped to take protective steps?
- Promptly report to the installation engineer any unusual conditions in stations, substations, or underground and overhead systems that may affect the continuity of service or endanger life or property. Take necessary protective steps immediately, even if stopping other work is necessary.
- TM 3-34.46 (3 May 2013), para 13-5
- 12R deep dive: Before switching, what safety requirement must the foreman meet so each worker knows what is energized?
- The foreman must perform the switching with great care and see that each worker knows exactly what is energized before starting work. The serving utility must also be notified before any switching that may affect that utility.
- TM 3-34.46 (3 May 2013), paras 13-11 and 13-12
12R – Section floor: Connectors, Construction, Safety, and Tools
Source: TM 3-34.46/MCRP 3-17.7K, Electrician's Mate, 3 May 2013. Complements mos-12r-interior-electrician and mos-12r-3 through mos-12r-5. Does not remake the plug, receptacle, armored-cable-connector, service-drop, hazardous-location, or generator-grounding cards. Public, unclassified sources only. Verify current editions.
- 12R deep dive: How must a conductor loop be inserted under a terminal screw?
- Always insert the loop under the terminal screw so that tightening the screw tends to close the loop. When correctly inserted, the loop brings the insulation ends close to the terminal.
- TM 3-34.46 (3 May 2013), para 1-19
- 12R deep dive: How are wood chisels and keyhole saws used to construct mounting brackets and open walls in existing buildings?
- Electricians use wood chisels and cross-cut or keyhole saws to remove wooden structural members that are obstructing a run, and to notch studs and joists for conduit, cable, or box-mounting brackets. They are also used to construct wood-panel mounting brackets. The keyhole saw may be used to cut openings in walls of existing buildings where boxes need to be added.
- TM 3-34.46 (3 May 2013), paras 2-10 and 2-11
- 12R deep dive: What safety rules apply when raising or lowering items between levels in the work area, and why must workers stand clear?
- Do not throw tools or materials up or down to workers on different levels. Use hand lines to raise or lower them individually, in canvas tool bags, or in buckets. Stand clear when tools or materials are raised or lowered, and avoid coming directly under the load until it is properly placed and secured. Keep tools and materials that are raised or lowered from touching conductors or other equipment. Avoid working at the base of a structure or a pole while others are working on it except in an emergency.
- TM 3-34.46 (3 May 2013), paras 13-22 and 13-23
- 12R deep dive: Which wrenches and tools are used on hexagonal and square fittings, and when should a pipe wrench not be used?
- Adjustable open-end wrenches (commonly called crescent wrenches) and open-end, closed-end, and socket wrenches are used on hexagonal and square fittings such as machine bolts, hexagon nuts, or conduit unions. Pipe wrenches are used for pipe and conduit work and should not be used where crescent, open-end, closed-end, or socket wrenches can be used. The design of a pipe wrench will not permit application of heavy pressure on square or hexagonal material, and continued misuse of a pipe wrench will deform the teeth on the jaw faces and mar the surface of the material.
- TM 3-34.46 (3 May 2013), para 2-6
12R – Toward 20: Terminal grounding, roughing-in, tools, and pliers
Source: TM 3-34.46/MCRP 3-17.7K, Electrician's Mate, 3 May 2013. Complements mos-12r-interior-electrician and mos-12r-3 through mos-12r-6. Does not remake already-used TM 3-34.46 paragraph cards. Public, unclassified sources only. Verify current editions.
- 12R deep dive: Where do you attach the grounding conductor of Type NM cable when you install a self-grounding receptacle, a switch, or a light fixture in the last box of a circuit run?
- Attach it directly to the box. As with most other terminal connectors, a grounding screw or clip is equipped to receive only one conductor.
- TM 3-34.46 (3 May 2013), para 4-34
- 12R deep dive: What two major divisions is interior construction work divided into, and what is installed during roughing-in?
- Roughing-in and finishing. Roughing-in is the installation of outlet boxes, cable, and conduit. Finishing includes the installation of switches, receptacles, covers, and fixtures and the completion of the service. Other trades use the interval between these two work periods for plastering, enclosing walls, finishing walls, and trimming.
- TM 3-34.46 (3 May 2013), para 1-20
- 12R deep dive: What tool features should a screwdriver have, and how should the tip be kept?
- The screwdriver should have an insulated handle. For efficient operation, select a screwdriver that matches the screw slot and keep the tips square and properly tapered. A screwdriver bit held in a brace is used for heavy-duty work. These tools are generally used to attach devices to boxes.
- TM 3-34.46 (3 May 2013), para 2-5
- 12R deep dive: What safety precaution applies when using insulated-handle pliers near an energized conductor?
- The CAUTION says that although insulated-handle pliers are always used when working on or near hot wires, they must not be considered sufficient protection alone. Other precautions must be taken.
- TM 3-34.46 (3 May 2013), para 2-2 (including the CAUTION)
12R – Interior Electrician
Source: DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R); DA Pam 611-21 ch. 10 MOS/skill-level classification listing (chapter-10-base); TM 3-34.46 (3 May 2013); ATP 3-34.45/MCRP 3-40D.17 (5 Feb 2024); TC 9-237 (7 May 1993). Verify current editions.
- 12R: What is the primary role of the Interior Electrician?
- Status: current MOS (DA Pam 611-21 ch. 10C). To install and maintain interior electrical systems – wiring, panels, outlets, lighting, and fixtures – in buildings and base camps.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) paras a and a(1) (interior electrical systems up to 600 volts)
- 12R: Where is 12R AIT?
- Fort Leonard Wood, MO – verify current length on goarmy.com.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para b(5) (course under the U.S. Army Engineer School; ACASP alternative in b(6)); 10C gives the USAES address as Ft Leonard Wood, MO (DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12D) para a; DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12P) para b(9)). Course length not in 10C
- 12R: What civilian code guides electrical installation standards?
- The National Electrical Code (NEC, NFPA 70). TM 3-34.46 states that the NEC governs all electrical construction, and 12R2Os inspect installations against the NEC and local ordinances.
- TM 3-34.46 (3 May 2013) para 12-40 ("The NEC governs all electrical construction"); DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para a(2). NFPA 70 is the NEC's standard number (not printed in TM 3-34.46)
- 12R: What is Ohm's law?
- Voltage = Current × Resistance (V = I × R).
- TC 9-237 (7 May 1993) para 10-17 (Resistance Welding: "in accordance with Ohm's law, I = E/R or R = E/I"; I in amperes, E in volts, R in ohms), para 10-4a (defines current I, voltage E and resistance R) and para 10-3b (current depends on resistance per Ohm's law). Not found in TM 3-34.46 or ATP 3-34.45
- 12R: What is a circuit breaker for?
- It automatically interrupts current flow during an overload or short circuit.
- TM 3-34.46 (3 May 2013) para 2-82 (circuit breakers trip on overloads or short circuits and combine the functions of a fuse and a switch)
- 12R: What is a GFCI?
- Ground Fault Circuit Interrupter – trips when current leaks to ground, protecting against electric shock in wet locations.
- TM 3-34.46 (3 May 2013) para 3-17 (GFCI protection for receptacles within 6 feet of a sink, in bathrooms and at grade level). TM 3-34.46 does not describe how a GFCI trips; that part is the general definition
- 12R: What is the purpose of grounding?
- Provides a safe path for fault current, reducing shock and fire hazards.
- TM 3-34.46 (3 May 2013) paras 3-29 (system ground reduces the possibility of fire and shock) and 3-30 (equipment ground keeps equipment at zero voltage so fuse protection opens the circuit on a short)
- 12R: What is the key electrical safety rule before work?
- Test the circuit before working on it (only with a test lamp or approved tester, never with fingers), de-energize it, and tag the main or control switches ("DANGER. Do not remove this tag or energize the circuit.") so it stays de-energized until released by the person who removed it from service.
- TM 3-34.46 (3 May 2013) paras 13-10 (circuit testing; follow chapter 14), 13-13 and 13-14 (tagging procedure). The term "lockout" was not found in TM 3-34.46
- 12R: What is the skill progression for 12R?
- 12R has only two skill levels: 12R1O interior electrician (E3/E4) and 12R2O (SGT). At skill level 3, electricians move to 12H Construction Engineering Supervisor (SSG, then SFC).
- DA Pam 611-21 ch. 10 MOS/skill-level classification listing (chapter-10-base) (12R1-2 only; 12H3 E6, 12H4 E7); DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12H) para a(1) (12H3O performs the duties of previous skill levels in MOS 12W, 12K or 12R)
- 12R: How does DA Pam 611-21 summarize the 12R major duties?
- The interior electrician supervises or performs installation and maintenance of interior electrical systems and equipment. (ch. 10C)
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para a
- 12R: What minimum ASVAB line score does DA Pam 611-21 list for 12R?
- 93 in EL (Electronics) (ch. 10C; verify current standards).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para b(4)(a) (EL 93; checked against 10C)
- 12R: What physical demands rating applies to 12R?
- Moderate (Gold), with a minimum physical profile of 111221; normal color vision required (ch. 10C).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) paras b(1)-(3) (10C also requires b(7) no record of acrophobia or claustrophobia)
- 12R: Under whose auspices is the 12R MOS course conducted?
- The U.S. Army Engineer School (DA Pam 611-21 ch. 10C).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para b(5)
- 12R: What are examples of additional skill identifiers (ASIs) for 12R?
- P6 – Project Management; Q6 – Protection Cell Operations (DA Pam 611-21 ch. 10C).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para c(1)-(2)
- 12R: What does DA Pam 611-21 list as 12R duties at skill level 1?
- Installs and maintains interior electrical systems up to 600 volts. (ch. 10C)
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12R) para a(1) (MOSC 12R1O)
Keep going: more Engineer decks
- 12BCombat Engineer418 cards
- 12NHorizontal Construction Engineer337 cards
- 12WCarpentry and Masonry Specialist243 cards
- 12KPlumber176 cards
- 12YGeospatial Engineer129 cards
- 12HConstruction Engineering Supervisor114 cards
Not your job? Use the MOS deck finder or see every MOS deck by career field.