US Army Flashcards

Home › MOS decks › 94Y

Electronic Maintenance · MOS 94Y

Quiz yourself on 94Y Integrated Family of Test Equipment Operator/Maintainer

Quick 94Y practice: 115 cards for the Integrated Family of Test Equipment Operator/Maintainer job, sorted into 13 decks you can drill one at a time.

Open 94Y in the appJump to the cards

How to drill 94Y

  1. Electronics repair cards include circuit basics and test equipment. Work any formula on paper before you flip.
  2. Pick one deck below and cover the answers with your hand or a sheet of paper.
  3. When a deck feels easy, open 94Y in the app and choose Practice test. It asks multiple-choice questions built from these same cards.

With 115 cards, try about 5 short rounds of 25 cards instead of one long session. One or two rounds a day keeps it fresh.

94Y decks on this page

94Y – Part 10: School graduation standards

Source: AR 350-1 (1 Jun 2025), para 3-13 (citing 10 USC 671); AR 350-1 (1 Jun 2025), para 3-13c; AR 350-1 (1 Jun 2025), para C-5j(1), C-5d, C-5e and C-5f(1)

94Y school graduation standards: Who sets the graduation requirements for 94Y initial entry training (AIT or OSUT), and which regulations' standards must graduates meet?
TRADOC establishes IET graduation requirements. Graduates of AIT or OSUT must also meet the standards of AR 40-501 (medical fitness), AR 600-9 (body composition) and AR 611-1.
AR 350-1 (1 Jun 2025), para 3-13c
94Y school graduation standards: What fitness test must be passed to graduate 94Y initial entry training, and what is the passing standard?
Graduates must pass the Army Fitness Test (AFT); for IET courses graduating after 31 May 2025 this applies to enlisted Soldiers and officers in all components. Passing the general standard means at least 60 points in each of the five events (3-rep maximum deadlift, hand-release push-up, sprint-drag-carry, plank, 2-mile run). Alternate aerobic events aren't allowed during IET, and commandants set retest guidance.
AR 350-1 (1 Jun 2025), para C-5j(1), C-5d, C-5e and C-5f(1)
94Y school graduation standards: Under 10 USC 671, what must a new 94Y Soldier complete before being assigned to active duty on land outside the United States?
Initial entry training (IET) within the Army. In time of war or a national emergency declared by Congress or the President, required IET may not be shorter than 12 weeks.
AR 350-1 (1 Jun 2025), para 3-13 (citing 10 USC 671)

94Y – Part 11: Final exam study guide

Source: DA Pam 611-21, ch. 10C (eff 202610 copy), para 10-94Y a(1)–(3); DA Pam 600-25, CMF 94 Career Progression Plan (Aug 2024), ch. 3 para a(3)

94Y final exam review: Do public official sources publish the 94Y AIT final-exam item bank or a passing score?
No. The 94Y school's exam item bank and end-of-course passing score aren't published in any public official source used here. This guide reviews key tasks and facts from DA Pam 611-21, DA Pam 600-25 and public Soldier's Manual listings; it isn't a set of exam answers.
Public-source limit as of 23 Nov 2026 (America/New_York): no public program of instruction, STP task list or end-of-course test publication for this MOS was available to the project (see sources/INDEX.md, MOS Study Expander 23 Nov 2026 entry).
94Y final exam review: What test equipment does the 94Y operate, and what are the SL1 core tasks?
The Base Shop Test Facility (BSTF), NGATS and DSETS. SL1 march-orders and emplaces the BSTF, installs weapon-system test program sets, runs unit-under-test (UUT) procedures, isolates circuit-board or component faults, replaces parts, performs alignments and adjustments, and does PMCS. SL2 adds supervision, modifications and maintenance records; SL3 sets workload and repair priorities.
DA Pam 611-21, ch. 10C (eff 202610 copy), para 10-94Y a(1)–(3)
94Y final exam review: Which publications does DA Pam 600-25 tell junior CMF 94 Soldiers like a 94Y to master?
STP 21-1-SMCT (common Soldier tasks), TC 4-02.1 First Aid, FM 4-33 Maintenance Operations, AR 670-1, FM 7-22, all -10 level maintenance manuals for their equipment, and the battle drills for their assignment.
DA Pam 600-25, CMF 94 Career Progression Plan (Aug 2024), ch. 3 para a(3)

94Y – Part 12: Test Program Electrical Stimuli, Sustainment-Level LRU/SRU TPSs, Classified Stimulus Values, ATE Electromagnetic Emanations

Source: DA Pam 750-43 (15 Jul 2024, admin revisions 22 Jun and 3 Aug 2026), paras 4-3a(1), 4-6c, 4-15d–g

94Y part 12: When an ATE runs a test program (TP), what electrical stimuli and circuit measurements does the coded sequence supply to the unit under test?
Instructions, stimuli applied to the unit under test (UUT), measurements of the UUT's responses, detection and isolation of UUT faults, and alignment/adjustment procedures for correcting the fault. A TP may reside on various forms of transportable media.
DA Pam 750-43 (15 Jul 2024), para 4-3a(1)
94Y part 12: At sustainment level, what do LRU go/no-go and LRU diagnostic test program sets each do to the electronic unit?
The LRU go/no-go TPS screens line replaceable units or determines an LRU's status after repair; the LRU diagnostic TPS isolates the fault to the shop replaceable unit (SRU). SRU TPSs work the same way one level down, screening SRUs or checking them after repair.
DA Pam 750-43 (15 Jul 2024), para 4-6c(1)–(2)
94Y part 12: How can a TPS developer keep classified test stimulus values out of a test program's electronic signal data?
Substitute unclassified dummy stimulus values for the actual classified values wherever possible. Where classified values can't be avoided, keep them in a separate classified TM until they are entered at runtime.
DA Pam 750-43 (15 Jul 2024), para 4-15d
94Y part 12: How can a TPS avoid displaying or printing classified electrical measurement values during a test?
Use dimensionless values, or display and print only the difference between the entered value and the actual measured value. The developer should also make classified parameters hard to find or extract from the software routines.
DA Pam 750-43 (15 Jul 2024), para 4-15e
94Y part 12: Who controls electromagnetic emanations from the Army standard electronic ATE when it processes classified data?
The Army's standard ATE manager, PD TMDE, which also sets ATE memory erasure criteria and distributes guidance. If published guidance isn't available, the MATDEV or TPS center contacts PD TMDE.
DA Pam 750-43 (15 Jul 2024), para 4-15f–g

94Y – Part 13: Career Board Standards – SSG Fitness, Education, Training, Assignments and Other Indicators

Source: CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y (sources/text/CMF94_Board_Products_8Aug2023.txt)

94Y part 13: What ACFT score marks a "most qualified" versus "highly qualified" 94Y SSG on the CMF 94 career board?
In the 8 Aug 2023 board products (ACFT era): MQ meant ACFT 540 or higher with at least 90 points in each event, and HQ 480 or higher with at least 80 points in each event. The AFT has since replaced the ACFT, so check current board guidance. SFCs refer to MOS 94W, and MSG/SGM/CSM to MOS 94Z.
CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y, Physical Fitness
94Y part 13: What military and civilian education marks a "most qualified" versus "highly qualified" 94Y SSG on the career board?
MQ: exceeded ALC course standards, a leadership award, Distinguished Honor/Honor Graduate, some college toward a degree, and consistent enrollment in military education courses. HQ: exceeded ALC course standards, Commandant's List, some college toward a degree, and completed military education courses.
CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y, Military/Civilian Education
94Y part 13: Which training courses mark a "most qualified" versus "highly qualified" 94Y SSG on the career board?
MQ: Additional Duty Safety Officer Course, Battle Staff, Combatives Level 3-4, EOL, Joint Logistics Course, Master Fitness Trainer and MRT. HQ: Combat Life Saver, Combatives Level 1-2, HAZMAT, MFT, MRT and a safety course.
CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y, Training
94Y part 13: Which broadening and critical leader development career assignments does the board list for a 94Y SSG?
Instructor, Training Developer, Drill Sergeant, Recruiter, Ranger training, Shop Foreman, Team Chief, Section Sergeant, Defense Attaché, Special Missions Units (SMU) and Warrior Transition Unit (WTU) NCO. Army-wide special duty assignments are defined in the annex to the board MOI.
CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y, Assignments
94Y part 13: What "other indicators" mark a most qualified 94Y SSG on the career board?
Airborne, Air Assault, the Army Award for Maintenance Excellence (AAME), foreign awards, SGT Audie Murphy and/or SGT Morales club, NCO of the Quarter/Year (brigade or higher), a mix of tactical and operational assignments, Old Guard, Ranger training, regimental awards, the Senior Instructor Badge, and additional duties annotated on evaluations.
CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y, Other Indicators

94Y – Part 3: Qualifications & Duties (NGATS, DSETS, BSTF), TMDE/TPS Scope, ATE Policy & Interface, TPS Categories, TPS Development & Acceptance, Fielding with Golden UUTs, Problem Reporting & Supply

Source: DA Pam 611-21 ch. 10C (Oct 2026 copy, 10-94Y); AR 750-43 Army TMDE (15 Jul 2024, admin rev 3 Aug 2026); DA Pam 750-43 Army TMDE Implementation Procedures (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026); ATP 4-33 (9 Jan 2024)

94Y part 3: Which test systems does 94Y operate and maintain?
NGATS, DSETS (Direct Support Electrical Test System), and the AN/TSM-191 Base Shop Test Facility (BSTF).
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para a)
94Y part 3: Besides ATE, what equipment does a 94Y repair?
Supported LRUs, SRUs and TPSs, combat vehicle components, Infantry and Artillery fire control systems, and related test equipment.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para a)
94Y part 3: What BSTF field task does a 94Y1O perform?
March order and emplacement of the BSTF.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para a(1))
94Y part 3: What does a 94Y1O do once the TPS is installed?
Starts the UUT procedures, isolates board or component faults, replaces parts, and does alignments and adjustments.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para a(1))
94Y part 3: What does a 94Y2O install?
BSTF, NGATS and DSETS equipment modifications.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para a(2))
94Y part 3: What training does a 94Y3O run?
On-the-job training (OJT) programs.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para a(3))
94Y part 3: What ASVAB scores qualify for 94Y?
EL 107, or EL 102 with ST 90.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para b(4)(a))
94Y part 3: What physical demands rating, profile, clearance and citizenship does 94Y require?
Moderate (Gold), profile 222221, normal color vision, SECRET eligibility, and US citizenship.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para b(1)-(3), (4)-(5) as numbered)
94Y part 3: Who can waive the 94Y course?
The Commandant, US Army Ordnance School, Fort Lee, VA.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, no eff date printed, para b(6))
94Y part 3: What three things make up a TPS, according to AR 750-43?
Test program software, test program hardware (TPH), and test program documentation.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 3-1b
94Y part 3: Is ATE considered TMDE?
Yes. TMDE includes ATE, alongside other test and measurement instruments.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 3-1a(2)
94Y part 3: What does embedded diagnostics and prognostics include?
Sensors including MEMS, databases, platform CPUs, smart wiring, automatic ID tech, and health-monitoring and IETM diagnostics.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 3-1c
94Y part 3: Why does the Army treat TMDE as a unique commodity?
It verifies accuracy, safety, readiness and IA of weapon systems, so it needs centralized acquisition and support.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 3-2a
94Y part 3: Where does the TMDE traceability chain begin?
At NIST and the USAPSL at USATA.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 3-2d
94Y part 3: Who determines ATE requirements for a new system?
System developers, with AFC, CASCOM and the PD TMDE.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-10
94Y part 3: Is ATE system software part of the ATE?
Yes. The ATE materiel manager decides how it's accessed, modified and maintained.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-11
94Y part 3: Who must changes to general-purpose ATE software be coordinated with?
Product managers of supported equipment, the capability developer, PD TMDE, USATA, and the AMC/AFC ATE TPS centers.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-11
94Y part 3: What is the ATE interface design goal for supported end items?
The fewest test connection points, TPS adapters and cables needed to quickly isolate a failed LRU or SRU.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-12
94Y part 3: When should TPS development begin?
Only once the UUT design has begun to stabilize, preferably through evolutionary development.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-4
94Y part 3: What UUT data must the MATDEV give a TPS developer?
Current UUT configuration, specs, theory of operation and manuals, FMECA data, and testability requirements.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-4a
94Y part 3: What is the central TPS planning document?
The TPS Management Plan (TPSMP), documented in the LCSP.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-5b
94Y part 3: Who advises the MATDEV on the TPSMP?
The AFC/AMC ATE TPS center manager.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-5d
94Y part 3: What must be emphasized when a non-NGATS TPS is developed?
Interoperability with NGATS, audited by the ATE TPS center.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-3f
94Y part 3: Who maintains organic capability to develop and sustain TPSs?
The AFC/AMC ATE TPS centers.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-3c
94Y part 3: What data rights must come with a TPS?
Maintenance and repair procedures, source files to regenerate test programs, embedded test software, and development station config info.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-4b
94Y part 3: What do at-platform field TPSs do?
Detect system failures (go/no-go) and isolate to the LRU or cables (diagnostic).
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-6a
94Y part 3: What do off-platform field TPSs do?
Screen LRUs and isolate faults to the SRU.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-6b
94Y part 3: What is an "ambiguity group"?
The component or group of components an SRU diagnostic TPS isolates to.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-6c(2)
94Y part 3: When is a UUT design considered stabilized?
Usually when engineering change proposals drop to a low steady level in production.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-7
94Y part 3: When are at-platform TPSs fielded?
With the supported system.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-7a
94Y part 3: What fills the gap if LRU/SRU TPSs aren't ready at IOC?
Interim contractor logistics support (ICLS) or another support agreement.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-7b(2)
94Y part 3: What must a TPS be able to do with BIT/BITE?
Interface with and analyze it.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-11
94Y part 3: What does using non-standard ATE require?
A waiver under AR 750-43, addressed in the TPSMP.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-12
94Y part 3: What are the four parts of TPS acceptance?
Acceptance test plan, acceptance test procedure, configuration audits, and acceptance test reports.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-30
94Y part 3: What must an acceptance test procedure state?
How many announced and unannounced faults are inserted, and what counts as pass or fail.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-30b
94Y part 3: What's the difference between an FCA and a PCA?
An FCA verifies performance against the baseline. A PCA checks the as-built TPS against its documentation.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-30c
94Y part 3: Who certifies a TPS?
The product assurance and test (PA&T) activity.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-37
94Y part 3: Who holds overall configuration management responsibility for a system's TPSs?
The materiel system configuration manager.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-38b
94Y part 3: Do TPSs need separate type classification?
No. They take the type classification of the systems they support.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 5-2
94Y part 3: How are TPSs accounted for at the using unit?
On the property book, per AR 710-2.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 5-2
94Y part 3: How are TPS problems reported?
Through the NGATS Help Desk or an SF 368 PQDR. TM problems go on DA Form 2028.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 5-5
94Y part 3: What is a "golden UUT" used for in fielding?
To get documented go-chains for each TPS at the ATE/TPS center and again at the user site.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 6-4b(2), (6)
94Y part 3: How early does the fielding team coordinate with the LAR?
At least 30 days before fielding.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 6-4b(3)
94Y part 3: Can a fielding team revise a TPS to fix a go-chain problem?
No. Discrepancies are resolved without revising the TPS.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 6-4b(6)(c)
94Y part 3: Who ships revised TPSs to the field?
The ATE/TPS center.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 6-6a
94Y part 3: Can a unit requisition a whole TPS?
Only in unusual cases such as battle loss or fire. Single parts are ordered by NSN.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 6-6c-d
94Y part 3: Who provides the TPS user hotline?
The ATE/TPS centers. Numbers come at fielding or from the LCMC LAR.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 6-7
94Y part 3: Which additional systems does NGATS test besides Abrams and Bradley?
Paladin and Avenger.
ATP 4-33 (9 Jan 2024), para 2-70
94Y part 3: What failure problem do the diagnostic systems prevent?
Turning in LRUs with no evidence of failure.
ATP 4-33 (9 Jan 2024), para 2-70
94Y part 3: What stocks does an FMC hold?
Only bench stock and shop stock. Other Class IX is at the SSA.
ATP 4-33 (9 Jan 2024), para 2-69

94Y – Part 4: Testability of Electronic Circuits, Test Program Hardware, and TPS Baselines

Source: DA Pam 750-43 (Army Test Program Set Implementation Guide, 15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), paras 4-9 and 4-25

94Y part 4: Why must testability of electronic circuits be considered early in system design?
Historically, electronic circuit testing wasn't considered until the end of design or the prototype phase, which raised TPS cost and limited TPS performance. The MATDEV must consider testability in the early conceptual design stages to reduce these risks.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-9
94Y part 4: What electrical role does test program hardware (TPH) play between the ATE and the unit under test?
TPH provides the mechanical and electrical connection and the signal conditioning between the ATE and the UUT.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-25g
94Y part 4: What documents make up a TPS's allocated and functional baselines?
The allocated baseline is the identified and approved documents defining the TPS configuration items. The functional baseline is the documentation at the PD TMDE website plus the configuration management plan, set after a successful preliminary design review.
DA Pam 750-43 (15 Jul 2024, admin revs 22 Jun and 3 Aug 2026), para 4-25b and d

94Y – Part 5: Board Leadership and Assignments, SSG Development Exception, TEMOD Program, TMDE Preferred Items List, Waivers and ATE Software Policy

Source: CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y; DA Pam 600-25, CMF 94 Career Progression Plan (9 Aug 2024), ch. 2; DA Pam 750-43 (15 Jul 2024), chs. 2-3

94Y part 5: What leadership positions does the CMF 94 board rate most and highly qualified for a 94Y MOS SSG career, and what SSG development rule does not apply to 94Y?
Most qualified: more than 24 months as Shop Foreman, Team Chief, or Section Sergeant; excelling in key staff jobs outside the MOS (e.g., battalion/brigade operations sergeant); serving above grade. Highly qualified: more than 12 months as Section Chief/Supervisor. SFCs are rated under 94W and MSG+ under 94Z. The CMF 94 rule that newly promoted SSGs stay 24 months in critical leader development positions does not apply to 94Y SSGs, since there are no operational assignments for them.
CMF 94 NCO Board Products (8 Aug 2023), MOS 94Y, Leadership Positions; DA Pam 600-25, CMF 94 (9 Aug 2024), para 2g
94Y part 5: Under DA Pam 750-43 policy, what is the TEMOD program and how is its prioritization standard run?
The Army's program of record for replacing obsolete test equipment, which also tackles duplicate functions bought without checking the inventory. Every two years the TEMOD Prioritization Joint Working Group, co-chaired by the AFC TMDE capability developer and PD TMDE, identifies and validates replacement general-purpose electronic test equipment for all maintainer MOSs; the prioritized list goes to the DCS, G-8 for approval, and PD TMDE uses it for materiel solutions.
DA Pam 750-43 (15 Jul 2024), paras 2-1, 2-2
94Y part 5: What are the TMDE Preferred Items List (PIL) objectives and the policy rules for adding or deleting items?
Objectives: catalog acceptable, supportable, available general-purpose and calibration instruments; identify candidates not yet qualified; and list ATE for cases where single-ATE-policy items may not fit. An item is added if it is standard general-purpose TMDE or IFTE general-purpose ATE, or if the PIL in-process review panel finds it suitable; PIL items must be type classified standard (candidates may be generic) with complete specs, and an item is deleted when no longer the most acceptable, available, or supportable. The PD TMDE-chaired panel meets every two years.
DA Pam 750-43 (15 Jul 2024), paras 2-4 to 2-6
94Y part 5: What paperwork is required to get a waiver from standard TMDE or standardized Army ATE?
For nonstandard TMDE when PIL standards can't meet the need cost-effectively: a memorandum request for waiver with DA Form 4062 (TMDE Acquisition Approval Analysis Data) and supporting documents to PD TMDE, plus a supportability analysis to USATA; PD TMDE replies by memo with approval or disapproval. For relief from standardized Army ATE: a memorandum with justification to PD TMDE, who concurs or non-concurs before ASA(ALT) approval.
DA Pam 750-43 (15 Jul 2024), paras 2-3a-c, 3-4
94Y part 5: What policy rules govern Army standard ATE system software?
PD TMDE manages the embedded software and decides how it is accessed, modified, and maintained. Changes are coordinated with product managers and commands whose equipment the ATE supports, the supported equipment's capability developer, USATA when applicable, and TPS development centers. The software is part of the ATE and must use an approved DoD high-order language on a commercial open-systems architecture, compliant with DoD Joint Technical Architecture policy.
DA Pam 750-43 (15 Jul 2024), para 3-5a-b(1)

94Y – Part 6: CMF 94 Multifunctional Logistician Merger and Project Athena Leader Development

Source: DA Pam 600-25, CMF 94 Career Progression Plan (9 Aug 2024), ch. 2, paras e, f

94Y part 6: Under the CMF 94 career plan, what does merging several MOSs into a multifunctional logistician mean for a 94Y's career?
It streamlines training and mission support, and the transformation increases broadening (experience) opportunities for SFCs and MSGs across many positions, such as Joint Logistics and Theater/Area Support Operations.
DA Pam 600-25, CMF 94 (9 Aug 2024), ch. 2, para e
94Y part 6: What is Project Athena in a 94Y career, and how is the Individual Development Plan (IDP) built?
A leader development program to inform and motivate leaders to pursue personal and professional self-improvement. The IDP sets actionable, measurable development objectives and specific activities, built through a collaborative discussion between the leader and a coach, guiding the leader without "telling the leader what to do."
DA Pam 600-25, CMF 94 (9 Aug 2024), ch. 2, para f

94Y – Part 7: Hot Mockups Banned, TPS Hardware and Software on NGATS, Level of Repair Analysis, Classified TPSs, TPS Verification, Validation and QA Certification

Source: AR 750-43 (15 Jul 2024), paras 3-12, 5-6, 5-7; DA Pam 750-43 (15 Jul 2024), paras 4-10, 4-15, 4-31, 4-32, 4-34

94Y part 7: Under AR 750-43, can a maintainer troubleshoot with a hot mockup or swap in known-good subcomponents instead of proper TMDE?
No. Using hot mockups or substituting known-good subcomponents in place of suitable TMDE is not authorized.
AR 750-43 (15 Jul 2024), para 3-12
94Y part 7: What ATE must test program set hardware and test program software be built to run on for Army maintenance?
TPS program hardware must be designed to interoperate with the Army standard integrated family of ATE (NGATS). Test programs are developed, or re-hosted from legacy ATE, to run on the Army standard IFTE family of ATE (NGATS).
AR 750-43 (15 Jul 2024), paras 5-6 and 5-7
94Y part 7: In a level of repair analysis (LORA), what must be weighed for a unit under test before deciding a TPS is required for maintenance?
A workload analysis of total testing time for the UUT at each maintenance level over a period (driven by its failure rate, no-evidence-of-failure rate, and inventory size), and a cost-effectiveness analysis of each option over its life cycle: labor (manual versus ATE testing time, skill levels, training), UUT spares and spare parts and transportation, life cycle costs of ATE, manual test equipment, TPS and BIT software, and hardware.
DA Pam 750-43 (15 Jul 2024), para 4-10
94Y part 7: When is a maintenance test program set classified, and how should classified diagnostic tests be handled if they catch only a few field failures?
A TPS is classified if its source or executable code contains classified information, if it displays or prints classified information during execution, or (possibly) if it processes classified information. Classification of TPS parameters is questioned. If the classified tests account for only a small share of field failures, the MATDEV should consider deleting the classified portion from fielded TPSs, using techniques that avoid classification.
DA Pam 750-43 (15 Jul 2024), para 4-15
94Y part 7: In TPS test and quality assurance for maintenance diagnostics, how does verification differ from validation, and what certification must each production TPS get before installation at ATE user sites?
Verification is the iterative check that each development step meets the requirements set by the previous step. Validation runs the software to exercise the hardware and compares test results to required performance. The first production model gets a development QA certification (conforms to contract and mission requirements). All remaining models need replication QA certification (the copy holds the same information as the original) before installation at user sites. The product baseline is set at TPS acceptance, and later changes go through the configuration manager.
DA Pam 750-43 (15 Jul 2024), paras 4-31, 4-32, 4-34

94Y – Part 8: Army Standard ATE (NGATS) Support Strategy, BIT/BITE Fault Detection Standards for Joint Programs

Source: DA Pam 750-43 (15 Jul 2024), paras 3-2a-b, 3-7a

94Y part 8: What is a materiel developer's first-priority ATE equipment support strategy, and what test equipment must contractors use for diagnostics?
First priority is Army standard ATE, such as the Next Generation Automatic Test System (NGATS), to meet maintenance requirements. Contractors for systems and subsystems must use, as far as possible, the same diagnostic capability that will be used in the field (no special factory test equipment); this applies to ATE for field, depot and factory OEM testing.
DA Pam 750-43 (15 Jul 2024), para 3-2a-b
94Y part 8: What BIT/BITE fault detection and isolation standard must a joint program's system equipment design meet?
BIT/BITE must detect 100 percent of detectable faults (per MIL-PRF-32070A) and isolate faults to a single component for 90 percent of detected faults with 85 percent confidence.
DA Pam 750-43 (15 Jul 2024), para 3-7a

94Y – Part 9: Qualifying standards (OPAT)

Source: DA Pam 611-21 ch. 10C (eff 202610 copy) para 10-94Y b; DA Pam 611-21 ch. 10 table 10-5 (as of Nov 2025)

94Y qualifying standards: What OPAT minimums apply to initial award of MOS 94Y?
Physical Demand Category Moderate (Gold): standing long jump 120 cm, seated power throw 350 cm, strength deadlift 120 lb and interval aerobic run 36 shuttles.
DA Pam 611-21, ch. 10C (eff 202610 copy), para 10-94Y b(4)(b)

94Y – Automatic Test Systems Operator/Maintainer

Source: DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y); DA Pam 611-21 table 10-1 (94A/E/F/H/M/P/R/T/Y graded 3-6; 94D and 94S 3-7; 94W 7-7; 94Z 8-9); ATP 4-33 (9 Jan 2024); AR 750-1 (29 Apr 2026); DA Pam 750-1 (29 Apr 2026); AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026) (paras 4-8 to 4-12, ch. 5, glossary); AIT location: goordnance.army.mil Ordnance training-location pages (schools/VA_lee.html, schools/GA_gordon.html, schools/AL_redstone.html; retrieved 22 Nov 2026) (94Y listed at Fort Lee, VA); HQDA GO 2025-16 (Fort Gregg-Adams redesignated Fort Lee, 11 Jun 2025). Equipment TMs are restricted (CAC) and were not opened; TM-level details are labeled.

94Y: What is the primary role of the 94Y?
Status: current MOS (DA Pam 611-21 ch. 10C). Automatic Test Systems Operator/Maintainer: operates, performs and supervises field maintenance on the Next Generation Automatic Test System (NGATS), the Direct Support Electrical Test System (DSETS) and the Base Shop Test Facility (BSTF, AN/TSM-191). Uses them to fault-isolate and repair line replaceable units (LRUs), shop replaceable units (SRUs) and test program sets for combat vehicles and Infantry and Artillery fire control systems.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, para a)
94Y: What was 94Y formerly titled?
Integrated Family of Test Equipment (IFTE) Operator and Maintainer.
DA Pam 611-21 ch. 10 MOS/skill-level classification listing (chapter-10-base) (35Y1-2 "Integrated Family of Test Equipment (IFTE) Operator and Maintainer" → 94Y, 200510; 94Y4 "(IFTE) Operator" → 94W, 1 Oct 2010); DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, para b still reads "IFTE operator and maintainer"); goordnance.army.mil Ordnance training-location pages (schools/VA_lee.html, schools/GA_gordon.html, schools/AL_redstone.html; retrieved 22 Nov 2026)
94Y: Why is automatic test equipment valuable?
It quickly isolates faults to the component level, speeding repairs and reducing parts costs.
ATP 4-33 (9 Jan 2024), para 2-70 (NGATS/DSESTS diagnostics "prevent line-replaceable units from being turned in to the supply system with no evidence of failure"); AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-12 (fault isolate a failed LRU or SRU "quickly and easily")
94Y: What is automatic test equipment (ATE)?
Computer-controlled test systems that run programmed tests on electronic components to diagnose faults.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), glossary ("Automatic test equipment": TMDE that performs a predetermined program to test parameters, evaluate degradation or fault-isolate malfunctions), para 4-9
94Y: What is a test program set (TPS)?
The software, interface hardware, and documentation needed to test a specific component on ATE.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 5-1a and glossary ("Test program set": interface devices, software test programs and documentation that let the ATE operator test the UUT)
94Y: What is the "next generation" ATE concept?
The Next Generation Automatic Test System (NGATS) and the maintenance support device make up the Army-standard ATE in the IFTE program. In armored BCT field maintenance companies, NGATS works alongside the Direct Support Electrical Systems Test Set, which is "soon to be retired."
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-9 (admin revision 3 Aug 2026 corrected the NGATS acronym); ATP 4-33 (9 Jan 2024), para 2-70
94Y: Who uses the results of 94Y testing?
Repairers who replace faulty components, and supply systems that evacuate items to higher-level repair.
ATP 4-33 (9 Jan 2024), paras 2-70, 2-71 (unserviceable SRUs/LRUs go on a work order to the BSB C&E shop, which uses diagnostic spares to replace the faulty element)
94Y: What is a circuit card assembly (CCA)?
A printed circuit board with components; many repairs isolate faults to a specific CCA.
ATP 4-33 (9 Jan 2024), paras 7-1, 7-28 (C&E maintainers repair down to circuit card assemblies). Definition: Unofficial – common unit practice/SOP; not found in official doctrine
94Y: What is an interface test adapter?
Hardware connecting the unit under test to the ATE.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), paras 4-12 (minimize TPS interconnection devices and cables), 5-1a (interface devices are part of the TPS). Adapter specifics: Not independently verified – likely in restricted TM (CAC) (TPS/ATE TMs)
94Y: What does "unit under test" (UUT) mean?
The component currently connected to and being tested by the test system.
AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), paras 5-1a, 5-4a (unit under test requirements); DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, para a(1): initiates UUT procedures)
94Y: What maintenance does the ATE itself require?
Self-tests, calibration of its instruments, and software updates.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, para a(1): NGATS, DSETS and BSTF PMCS, operational checks, alignments and adjustments); AR 750-43 (15 Jul 2024, admin rev 3 Aug 2026), para 4-11 (ATE system software management)
94Y: Why is ESD control essential for 94Y?
Components under test are sensitive to static discharge.
Not independently verified – likely in restricted TM (CAC) (ATE and TPS TMs (ESD-sensitive device handling))
94Y: Where do 94Ys work?
In field maintenance companies (FMCs), for example in armored BCT brigade support battalions, where NGATS tests Abrams and Bradley LRUs and SRUs. NGATS diagnostic testing also covers Paladin and Avenger.
ATP 4-33 (9 Jan 2024), para 2-70
94Y: Where is 94Y AIT?
94Y training runs under the U.S. Army Ordnance School. The Ordnance training-location page lists 94Y (under its old title, IFTE Operator/Maintainer) at Fort Lee, VA. Check the course length with a recruiter or ATRRS.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, para b(6)); goordnance.army.mil Ordnance training-location pages (schools/VA_lee.html, schools/GA_gordon.html, schools/AL_redstone.html; retrieved 22 Nov 2026); HQDA GO 2025-16 (Fort Gregg-Adams redesignated Fort Lee, 11 Jun 2025)
94Y: What is the skill progression for 94Y?
SL1 operator/maintainer; SL2 team leader; SL3 section sergeant; then 94W/94Z.
DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-94Y, paras a(1)-(3)); DA Pam 611-21 table 10-1 (94A/E/F/H/M/P/R/T/Y graded 3-6; 94D and 94S 3-7; 94W 7-7; 94Z 8-9); DA Pam 611-21 ch. 10 MOS/skill-level classification listing (chapter-10-base) (94Y4 → 94W, 1 Oct 2010); DA Pam 611-21 ch. 10C (10-94W para b(6): 94W requires completion of the 94A, 94E, 94F, 94H, 94M, 94P, 94R, 94T or 94Y course)

CMF 94 – Electronic Maintenance Common

Source: DA Pam 611-21 (CMF 94); ATP 4-33 (Maintenance Operations); AR 750-1; TB 385-4 and general ESD/TMDE practice. Applies across 94-series MOSs. Verify current editions. Do not confuse this common module with MOS-specific 94E/94A/94S cards.

CMF 94: What is the primary role of CMF 94, Electronic Maintenance?
Status: current career management field (DA Pam 611-21 ch. 10C). To maintain, repair, and test Army electronic systems — missiles, radars, radios, computers, TMDE, aviation electronics, and related equipment — so supported units stay mission capable.
DA Pam 611-21, CMF 94 specifications
CMF 94: How does a 94-series repairer usually fit into Army maintenance levels?
The same two-level system as other maintainers: field maintenance (on-system diagnosis and repair) and sustainment maintenance (off-system repair, overhaul, and return to supply), assigned by the Maintenance Allocation Chart in the TM.
AR 750-1; ATP 4-33; CMF 91/94 common maintenance policy
CMF 94: What is TMDE?
Test, Measurement, and Diagnostic Equipment — calibrated tools and instruments (multimeters, oscilloscopes, radio test sets, torque testers, and similar items) used to diagnose and verify electronic and other systems. Uncalibrated TMDE can produce false diagnoses.
TB 43-180 or current TMDE calibration policy; MOS 94H role (verify current pub)
CMF 94: What is ESD, and why does it matter in electronic maintenance?
Electrostatic discharge. Static electricity can destroy sensitive components that still look normal. Use grounded wrist straps, ESD-safe mats, and approved bags when the TM requires them, and avoid working on open circuit cards in dry, carpeted, or uncontrolled spaces.
TB 385-4 or current ESD/electronic-safety guidance; equipment TMs
CMF 94: What is a common first troubleshooting question on an electronic system that "does not work"?
Confirm the symptom, then check power, connections, settings, and the operator-level built-in test or PMCS before replacing a major assembly. Many "bad boxes" are unseated connectors, blown fuses, or operator setup errors.
ATP 4-33 troubleshooting practice; equipment TMs (BIT/PMCS)
CMF 94: Why must you follow the TM's troubleshooting tree instead of swapping line-replaceable units at random?
Random swapping wastes parts, can introduce new faults, and may violate the MAC. The TM tree is the authorized path to isolate a fault to the correct component and maintenance level.
Equipment TM troubleshooting; Maintenance Allocation Chart (MAC)
CMF 94: What is a line-replaceable unit (LRU) or shop-replaceable unit (SRU), in plain language?
An LRU is a modular assembly meant to be replaced at field level when the TM authorizes it. An SRU is a lower assembly usually repaired in a shop or at sustainment. Exact terms and authorized levels are in the TM and MAC.
Equipment TMs; ATP 4-33
CMF 94: What COMSEC rule applies when a 94-series Soldier works on a CCI or radio that can hold key?
Keep the item under accountability and authorized, cleared control; zeroize or remove key as the SOP and TM require before opening or evacuating the item; and never treat COMSEC parts as ordinary unclassified scrap.
ATP 6-02.75; AR 380-40; related 94E module cards (do not copy procedures beyond this public level)
CMF 94: What is BIT or BITE on an electronic system?
Built-in test (or built-in test equipment) — diagnostic functions designed into the system to detect and isolate faults. BIT results are a starting point, not always a final diagnosis; confirm with the TM and calibrated TMDE when required.
Equipment TMs; general electronic-maintenance practice
CMF 94: Who typically provides 94-series support to a brigade combat team?
Electronic maintainers in the brigade support battalion, forward support companies, or specialized maintenance units, depending on the system (for example, land-combat missiles, SHORAD, radars, or tactical radios). The exact MTOE varies by brigade type.
ATP 4-33; DA Pam 611-21 CMF 94; unit MTOE
CMF 94: What is the 94W / 94Z relationship in CMF 94?
94W is the Electronic Maintenance Supervisor (typically SFC); 94Z is the Senior Electronic Maintenance Supervisor at MSG/SGM. Confirm current grade bands in DA Pam 611-21 because capper structure can change.
DA Pam 611-21; already noted in the CMF 91/94 common module
CMF 94: Why is calibration status checked before using a test set on a missile or radar system?
Out-of-tolerance TMDE can fail a good system or pass a bad one, which can be a safety and mission problem. Check the calibration label and do not use overdue TMDE.
TMDE calibration policy (TB 43-180 or successor); shop SOP
CMF 94: What personal safety hazards are common in electronic shops besides ESD?
High voltage, RF energy, lasers on some systems, elevated work, batteries, and solder fumes. Apply lockout/tagout, the TM's warning pages, and the shop SOP before applying power to an open chassis.
TB 385-4 or current electronics safety pub; AR 385-10; equipment TMs
CMF 94: How should a 94-series repairer handle a software or firmware load on a fielded system?
Use only authorized software from official sources and the current TM or technical information, and record the action as the SOP requires. Do not load unofficial files from a personal drive.
Equipment TM / technical information; Army cybersecurity and maintenance policy
CMF 94: What should you do if a diagnostic test conflicts with a visual or operational symptom?
Stop and re-check the setup, TMDE, and test conditions; do not automatically condemn the most expensive assembly. Consult the TM, a supervisor, or the next-higher maintenance level.
Equipment TM troubleshooting; ATP 4-33
CMF 94: Where are official 94-series MOS titles and qualifications found?
DA Pam 611-21, chapter 10C. Several 94-series titles were corrected in this app against that chapter (for example 94F, 94R, and 94Y). Always re-check the current 10C before counseling a Soldier on an MOS title.
DA Pam 611-21, ch. 10C

Keep going: more Electronic Maintenance decks

Not your job? Use the MOS deck finder or see every MOS deck by career field.