14T flashcard drill: Patriot Launching Station Enhanced Operator/Maintainer
Want to know your 14T material cold? Start here. There are 156 flashcards for the Patriot Launching Station Enhanced Operator/Maintainer job, and the biggest deck, “Launching Station Tasks (STP 44-14T14) and Duties,” has 112 cards.
- 156 cards
- 14 decks
- Quiz mode
How to drill 14T
- Pick one deck below and cover the answers with your hand or a sheet of paper.
- Air defense cards are full of system names and short forms. Run a fast round where you only say what each acronym stands for.
- When a deck feels easy, open 14T in the app and choose Practice test. It asks multiple-choice questions built from these same cards.
With 156 cards, try about 7 short rounds of 25 cards instead of one long session. One or two rounds a day keeps it fresh.
14T decks on this page
- 14T – Part 10: Alert States1 card
- 14T – Part 11: Training in Theater and Board Indicators3 cards
- 14T – Part 12: Board Fitness, Education and Indicators3 cards
- 14T – Qualifying standards4 cards
- 14T – School graduation standards1 card
- 14T – Final exam study guide2 cards
- 14T – Part 3: Launching Station Tasks (STP 44-14T14) and Duties112 cards
- 14T – Part 4: Perimeter Defense, Road March Standards and Live-Fire Safety8 cards
- 14T – Part 5: Generator and BMC March Order2 cards
- 14T – Part 6: Who Authorizes Patriot Engagements1 card
- 14T – Part 7: Training to Standard on Gunnery Tables1 card
- 14T – Part 8: Unit Certification Programs1 card
- 14T – Part 9: Training Standards and Task Atrophy1 card
- 14T – Patriot Launching Station Enhanced Operator/Maintainer16 cards
14T – Part 10: Alert States
Source: FM 3-01, Air and Missile Defense Operations (26 Aug 2025), ch. 4
- 14T: Besides governing readiness, what maintenance and training opportunities do alert states give?
- The senior ADA commander uses alert states to govern subordinate units' readiness levels, and they also give those units opportunities for maintenance and training.
- FM 3-01 (26 Aug 2025), para 4-11
14T – Part 11: Training in Theater and Board Indicators
Source: FM 3-01, Air and Missile Defense Operations (26 Aug 2025), ch. 1; CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages
- 14T: After arriving in theater, how do ADA units keep training to standard?
- They keep training and rehearsing as time, the threat and conditions allow, regularly review Soldier and equipment readiness, run emergency deployment readiness exercises, and pass lessons learned up the chain and on to follow-on forces.
- FM 3-01 (26 Aug 2025), para 1-97
- 14T: For career progression, what training makes a 14T SSG or SFC most qualified on the board supplement?
- Patriot Master Gunner (ASI T4) and THAAD (ASI X8).
- CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages (Training)
- 14T: Which proponent-specific broadening assignments are listed for a 14T SSG?
- Training Developer (DOTD) and NCOA Small Group Leader (both nominative/key billets), ADA Training Coordinator, TAFT NCO, Drill Sergeant and Recruiter.
- CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages (Assignments)
14T – Part 12: Board Fitness, Education and Indicators
Source: CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages
- 14T: On the Oct 2024 board supplement, what ACFT fitness standard marks a 14T SSG or SFC as most or highly qualified?
- Most qualified: 540 or higher. Highly qualified: 480 or higher.
- CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages (Physical Fitness)
- 14T: For career progression, what education makes a 14T SSG or SFC most qualified?
- SSG: ALC/SLC honors or leadership award and an associate's degree. SFC: SLC/MLC honors or leadership award and a bachelor's degree.
- CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages (Military/Civilian Education)
- 14T: For career progression, name three SSG "other indicators" on the 14T board page.
- Any three of: filled a 14T4O position, SAMC, SGT Morales Club, NCO of the Quarter/Year, Instructor or Curriculum Developer of the Year, Basic or Senior Instructor Badge, Order of Saint Barbara, Best Squad/Crew.
- CMF 14 NCO Evaluation Board Supplement (board products, 30 Oct 2024), MOS 14T pages (Other Indicators)
14T – Qualifying standards
Source: DA Pam 611-21 ch. 10C (Oct 2026 copy) (Oct 2026 changes applied); goarmy.com job page checked 23 Nov 2026 (only for facts DA Pam 611-21 does not cover)
- 14T: What formal training is mandatory for award of 14T?
- Completing the MOS 14T course under the U.S. Army ADA School. goarmy.com lists 7 weeks of AIT.
- DA Pam 611-21 ch. 10C (Oct 2026 copy), para 10-14T b(7); goarmy.com job page (checked 23 Nov 2026), https://www.goarmy.com/careers-and-jobs/aviation/detecting-aerial-threats/14t-patriot-launching-station-operator
- 14T: How does a new recruit enlist to become a 14T?
- As an Air Defense Artillery Soldier (14U). The Army then assigns the specific 14-series job at Basic Combat Training, based on Army needs and skills assessed there.
- goarmy.com job page (checked 23 Nov 2026), "At a Glance" panel, https://www.goarmy.com/careers-and-jobs/aviation/detecting-aerial-threats/14t-patriot-launching-station-operator
- 14T: What basic requirements to enlist for 14T does goarmy.com list?
- Age 17 to 42, a high school diploma or GED, meeting tattoo guidelines, no major law violations and no medical concerns.
- goarmy.com job page (checked 23 Nov 2026), "At a Glance" panel, https://www.goarmy.com/careers-and-jobs/aviation/detecting-aerial-threats/14t-patriot-launching-station-operator
- 14T: Which components list 14T as an entry-level enlisted job on goarmy.com?
- Active Duty and Army National Guard; the page does not list the Army Reserve.
- goarmy.com job page (checked 23 Nov 2026), "At a Glance" panel, https://www.goarmy.com/careers-and-jobs/aviation/detecting-aerial-threats/14t-patriot-launching-station-operator
14T – School graduation standards
Source: FCoE 30th ADA Brigade, "ADA AIT" page (undated), https://sill-www.army.mil/30ada/ait.html, via Internet Archive snapshot 2 May 2026
- 14T: How long is 14T AIT on the 30th ADA Brigade page?
- 13 weeks after 10 weeks of Basic Combat Training. goarmy.com (checked 23 Nov 2026) lists 7 weeks, so check the current length.
- FCoE 30th ADA Brigade, "ADA AIT" page (undated), https://sill-www.army.mil/30ada/ait.html, via Internet Archive snapshot 2 May 2026, 14T "Training"; goarmy.com 14T page checked 23 Nov 2026
14T – Final exam study guide
Source: STP 44-14T14-SM-TG (15 Mar 2002; old edition, verify against current ICTL)
- 14T: Which 14T skill level 1 tasks does the STP list as first trained in AIT?
- 25 of 39: LS emplacement and march order, LS PMCS and most LS maintenance, DA Form 2404/5988-E, PALS, HEMTT operation, all missile reload tasks, and SINCGARS operation.
- STP 44-14T14-SM-TG (15 Mar 2002; old edition, verify against current ICTL), ch. 2 Part Two, Critical Tasks (SL1), training location column
- 14T: Which 14T skill level 1 tasks are first trained in the unit, not AIT?
- Surviving-to-operate tasks (M8A1 alarm, AN/PSS-12, D2, BDAR), support maintenance equipment (BMC and 15-kW generator), remote launch at the CRG, and a few LS maintenance/PMCS tasks.
- STP 44-14T14-SM-TG (15 Mar 2002; old edition, verify against current ICTL), ch. 2 Part Two, Critical Tasks (SL1), training location column
14T – Part 3: Launching Station Tasks (STP 44-14T14) and Duties
Source: STP 44-14T14-SM-TG, Soldier's Manual and Trainer's Guide, MOS 14T, Skill Levels 1–4 (15 Mar 2002; public release, distribution unlimited); DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T). The STP is dated 2002, so steps reflect the equipment of that time (verify in current TMs/drills); STP tasks are cited by task number.
- 14T: What drill standard governs launching station emplacement and march order?
- ARTEP 44-635-14-Drill.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 and 441-082-1102
- 14T: What is the first step when emplacing the LS at a prepared site, after positioning it?
- Install the ground rod.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (performance measures 1–2); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: During LS emplacement, what is done right after lowering the outriggers and uncoupling the tractor?
- Level the LS.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (performance measures 5–6); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: In LS emplacement, what is the power-up order after leveling?
- Start generator A6, close the A6 circuit breaker, energize A2, then energize A1.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (performance measures 7–10); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Where is the local BITE test run during LS emplacement?
- At A1A14.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (performance measure 11); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: How is control of the LS handed to the ECS at the end of emplacement?
- With the A1A2 local/remote key.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (performance measure 22); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What must be done to the canisters' GM torque tube handles at emplacement and at march order?
- Unlock them at emplacement; lock them (and disconnect the GMs) at march order.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (measure 21) and 441-082-1102 (measure 4); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Name the alignment tools listed for LS emplacement.
- An M2 aiming circle and a gunner's quadrant.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (conditions)
- 14T: What fiber-optic item may need retrieving at LS march order, and how do you know?
- The fiber-optic cable assembly (FOCA); the unit TSOP says if retrieval is required.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1102 (measure 2); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What is the first step of LS march order?
- Select local mode.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1102 (measure 1); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: During LS march order, where does the turntable go?
- To the travel position.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1102 (measure 3); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What check is done after coupling the tractor at march order?
- A jerk test, then raise the front outriggers.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1102 (measure 19); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What torque check is made at both emplacement and march order?
- Verify the torque on the canister tiedown bolts.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1100 (measure 12) and 441-082-1102 (measure 10); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What does a 14T check on the guided missile canister instrument panel?
- Humidity indicator (damage and excess humidity), quick-release pin, heater connector J2, electrical connector J1 and ground terminal J3.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1104 (measure 1); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What does a 14T check on the canister isolation frames?
- Shock mounts, anchor shackles and wood runners.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1104 (measure 2); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What fittings are on each GMC's mainframes?
- Four eye bolt rings, four tiedown bolts, four shaft interlock fittings and four alignment pins.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1104 (measure 3)
- 14T: Which TM covers operator PMCS on the guided missile canister?
- TM 9-1410-600-14 (chapters 3 and 4).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1104 (standards)
- 14T: Which forms record faults found during PMCS, and which pamphlet governs them?
- DA Form 2404 or DA Form 5988-E, per DA Pam 738-750.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1104, 441-082-1105 and 441-084-1116
- 14T: What mode must the LS be in for operator PMCS?
- Local mode.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1105 (conditions); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What is PALS used for?
- The Patriot Automated Logistics System is used to perform corrective maintenance on Patriot equipment.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1500
- 14T: Before a 14T does corrective maintenance on the LS, who decides to take it off-line?
- The BMO (battalion maintenance officer), after preliminary fault assessment and deactivation.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1000 (conditions)
- 14T: What is the general sequence for LS corrective maintenance?
- Confirm the operator's fault data, isolate the fault, run diagnostics if needed, replace the faulty BRU, verify the fix, record it, then tell the operator to activate the system.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1000 (performance measures); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Which LS subsystems does a 14T maintain at operator/organizational level?
- AC/DC distribution, data link terminal module (DLTM), launcher electronics module (LEM), launcher mechanics, LMRD, MRCTS, LSTS, ELES and the LSDU.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1000 to 441-082-1007 and 441-082-1110
- 14T: How does a 14T confirm and clear a fault on the missile round cable test set (MRCTS)?
- Run the MRCTS A8 test to confirm, replace the BRU, then rerun the A8 test.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1005; 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: How is an LSTS fault confirmed and cleared?
- Run the LSTS self-test, replace the faulty BRU, then rerun the self-test.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1006; 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What extra steps can ELES maintenance include?
- Stray/no-voltage and continuity checks, and a software download to the executive processor card if needed.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1007; 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: If the tactical situation won't allow checking all HEMTT lights, which must be checked?
- The blackout lights.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1108 (note); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What form records a HEMTT trip's times, mileage and fuel?
- DD Form 1970 (or DA Form 5987-E).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1108 (measures 5 and 15)
- 14T: Where is remote launch initialized for Patriot launchers?
- At the communications relay group (CRG), per TM 9-1430-604-10.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1574
- 14T: When initializing remote launch at the CRG, where must COMPUTER SELECT be set?
- REAR, with MODE SELECT at position 3, and LCS CONFIG set to ON.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1574 (measures 1–4); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: When relinquishing remote launch, what if the controlling PFP hasn't released the launchers?
- Request launcher control from the controlling PFP by voice.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1575 (measure 8); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: When remote launch is terminated, what happens to launchers still in operate mode?
- The RLRIU sends a Launcher Action Message to put each in standby; if any stay in operate after three tries, termination failed.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1575 (note); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Which manual governs loading and removing guided missile canisters on the LS and GMT?
- TM 9-1440-600-10, chapter 2 (TM 9-1440-1600-10 for the enhanced LS).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1106 to 441-082-1109
- 14T: What torque are the four canister tie-down bolts tightened to after a reload?
- 60 foot-pounds.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1106 (measure 6) and 441-082-1107 (measure 7); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What controls the canister while it is lifted during reload?
- Tag lines, with the sling on the hoist.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1106 and 441-082-1107; 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What test follows loading a GMC onto the LS?
- The missile-round cable test, or the stray/no-voltage and test-launch procedures.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1107 (measure 8); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Before lifting a GMC off the LS, what must you confirm about the torque handle?
- It's locked with no red paint showing.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1108 (measure 2); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: How high is a GMC raised to clear the alignment pins when removing it?
- About 6 inches.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1108 (measure 6) and 441-082-1109 (measure 6); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What must be done to a GMC once it's set on the ground?
- Ground it.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-1108 (measure 9); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What vehicle's crane is used for Patriot missile reload in the STP?
- The crane on the 10-ton HEMTT (M977).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1111
- 14T: What is the first step before operating the reload crane?
- Clear the area of people, structures and equipment the crane could hit.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1111 (measure 1); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Name three duties of the crane signalman.
- Any three: keep boom area clear, tell handlers the load destination, check load on hook, check area before lowering, tell operator of weight changes, stay visible, use standard arm-and-hand signals.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1112
- 14T: What is the goal of denial and destruction (D2) of Patriot equipment?
- Make it tactically useless and impossible for the enemy to restore by repair or cannibalization.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (standards)
- 14T: Which TM sets the priorities for destroying Patriot equipment?
- TM 43-0002-23 (with the unit D2 SOP).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132
- 14T: Name the five ways to destroy Patriot components in D2.
- Improper operation (mechanical), mechanical means, weapons fire, fire and demolition.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (measures 1–5)
- 14T: What is done before any D2 destruction method?
- Disconnect power and remove and empty all fire extinguishers.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (measures 2–5)
- 14T: In D2 by weapons fire, what minimum firing distances apply without cover?
- 275 m for equipment; 460 m when firing on the guided missile.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (measure 3d–e)
- 14T: How long should weapons fire on equipment continue in D2?
- At least 10 minutes, unless well-placed hits start an intense fire.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (measure 3h)
- 14T: What is the minimum safe distance without cover when destroying a missile by demolition?
- 460 m (1,500 ft).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (measure 5f)
- 14T: How is Patriot equipment "denied" without destroying it?
- Remove vital components and hide them (submerge, cave or bury) or disperse them into heavy brush; recover them if the area is retaken.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (measure 6)
- 14T: How is D2 trained in peacetime?
- Orally: the evaluator reads each step and the Soldier explains what he'd do.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1132 (evaluation preparation)
- 14T: Which field manual governs Patriot BDAR in the STP?
- FM 9-43-2, with the end-item technical publications.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1513
- 14T: In Patriot BDAR, what must be reported before repairs start?
- Equipment manning status, initial equipment status, current enemy action and obvious hazards.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1513 (measures 2–5)
- 14T: What tests are run during Patriot BDAR before restoring functions?
- PMCS, then self-test, functional test and operational tests.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1513 (measures 6–7)
- 14T: What is the BMC?
- The Battalion/Battery Maintenance Center, a semitrailer shelter where the Patriot logistics system (PALS) is installed.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1400
- 14T: What size generator powers the Patriot support maintenance equipment, and what does it feed?
- A 15-kW set; it powers the BMC and SRPT through a power distribution box.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1402
- 14T: What goes on the ground first when emplacing the 15-kW generator?
- The fire extinguisher, right after uncoupling the trailer.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1402 (measures 2–3); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Which TM covers BMC emplacement, march order and PSME PMCS?
- TM 9-4935-600-14.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1400, 441-084-1411 and 441-084-1419
- 14T: In supervised BDAR, who sets the repair priorities and confirms the maintenance level?
- The system maintenance technician; crews report status to the BDAR NCOIC by FM radio.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-2000 (note)
- 14T: What may a crew use to repair battle damage to combat-capable condition?
- The BDAR repair kit or any usable items found in the area.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-2000 (measure 4)
- 14T: What tractor pulls the Patriot LS?
- The M983 HEMTT tractor.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (conditions)
- 14T: Over what is the LS positioned when emplaced?
- The marker stake.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measure 1)
- 14T: Which three LS items must be energized during emplacement, per the supervisor's checklist?
- The generator set, the DLTM and the LEM.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measure 10); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What does the LS chief tell the ECS at the end of emplacement?
- The missile heat time.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measure 17); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Which lights must be off before the crew clears the LS?
- The MISSILE HAZARD lights.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measure 19); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Where is the LOCAL/REMOTE key set when the LS is ready to fight?
- REMOTE (it's switched to LOCAL and removed for march order).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measure 21) and 441-082-2055 (measure 2); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: When is a location and alignment form turned in to the ECS?
- When the LS was manually emplaced (aligned with the M2 aiming circle).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measures 16, 22)
- 14T: What orientation checks does the LS chief verify at emplacement?
- Synchronization, orientation and alignment, and roll and cross roll.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2054 (measures 13–15); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Where is the engagement control handle set for march order?
- ROAD MARCH.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2055 (measure 5); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Who first puts the LS in LOCAL at march order?
- The ECS.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-2055 (measure 1); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: What makes up the Patriot system maintenance section's equipment?
- A 15-kW generator, the BMC, and large and small repair parts transporters (LRPT/SRPT).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-2100 (conditions)
- 14T: When a fault report comes in, what does the supervisor do first?
- Make sure the fault is valid, then assign system mechanics to fix it.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-2104 (measures 1–2)
- 14T: How many crew members does the STP list for a supervised missile reload?
- Four, plus a GMT and the crane.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-3028 (conditions)
- 14T: Before a reload starts, what must the LS chief verify about the launcher?
- Safety brief given, LOCAL/REMOTE in LOCAL, unexpended missiles' torque handles locked, platform lowered with lockpins in, and GM cables disconnected.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-3028 (measures 1–5); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: During reload, what is inspected on the LS after the empty canister is lifted off?
- The LS alignment pins.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-3028 (measure 14); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Which sling setting must be checked when lifting canisters during reload?
- The correct EMPTY/LOADED position.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-3028 (measures 12, 16); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: In reload, when are the GM cables connected to a new canister?
- Only after a successful missile-round cable test (or stray/no-voltage and test-launch checks for PAC-3).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-3028 (measures 21–22); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: In the 2002 STP, which launcher and trailer make up the LS?
- The M901 launching station on an M860A1 semitrailer, towed by an M983 HEMTT.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-3029 (conditions)
- 14T: Name four things to confirm crews know before a road march.
- Any four: strip map and route, convoy speeds and intervals, breakdown actions, ground/air attack actions, NBC attack actions.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-3026
- 14T: What is the maximum slope for emplacing a Patriot LS?
- 10 degrees (per TM 9-1440-600-10).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (performance step 1c)
- 14T: How many people mate the DLT antenna, and when?
- At least two, before the platform is raised.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (step 1f); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Which LS lights show it's safe after emplacement?
- MISSILE HAZARD lights off and MISSILE DISCONNECT lights on (BITE passed).
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (step 1h); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: How are fiber-optic cables run from the launcher, and why?
- At 90° away from the launcher for at least 20 m, to avoid backblast damage.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (step 1i); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Once launchers are remoted, who may stay downrange?
- Only essential personnel, the "hot crew."
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (steps 1k and PM 1b–c)
- 14T: What is the preferred LS position relative to the radar set (RS)?
- Rear end toward the RS, with the RS within 30° and centered on the LS.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (step 2)
- 14T: What three angles are measured with the aiming circle for the location/alignment form?
- LS-to-RS azimuth, LS-to-north-reference azimuth, and LS-to-RS elevation angle.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (step 2a–c); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Is the LS aligned before or after the radar set is oriented?
- After the RS is oriented to a north reference.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4027 (step 2); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: Before a Patriot convoy, what must be confirmed about the route?
- That it can take the height, width and weight of Patriot equipment, plus routes, checkpoints and likely ambush sites.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4028 (step 1)
- 14T: Who has authority to order denial or destruction of equipment?
- Only division or higher commanders; it's reported through command channels.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4028 (step 1)
- 14T: In demolition D2, why must radios and radars be off with electric blasting caps?
- RF signals can induce current and set off caps prematurely.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4028 (warning)
- 14T: How fast does safety fuse burn, and how much is used with non-electric caps?
- About 1 ft per 30–40 seconds (test it first); use at least 5 ft.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4028 (step 3e and note)
- 14T: What is the explosives danger radius in D2 demolition?
- At least 275 m (900 ft); 460 m (1,500 ft) for the guided missile without cover.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4028 (step 3e)
- 14T: Why are demolition charges dual-primed in D2?
- To reduce the chance of a misfire.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4028 (step 3e)
- 14T: What special care is needed when destroying some Patriot equipment?
- Components with radioactive parts need special handling to avoid contaminating people.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4028 (step 6)
- 14T: In a Patriot section perimeter defense plan, how far out is the mortar FPF?
- No more than 200 m in front of the section equipment.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4029 (step 1f)
- 14T: How many target reference points does a section defense plan need?
- At least two.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4029 (step 1e)
- 14T: What force must the platoon sergeant keep under his control for perimeter defense?
- A quick reaction force.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4029 (step 2)
- 14T: In the dark, how should maintenance platoon crews work during emplacement?
- In pairs.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-082-4020 (measure 2d)
- 14T: Name three sustainment actions a Patriot platoon sergeant coordinates.
- Any three: small arms basic load, refueling, medevac, recovery and evacuation, decon, controlled exchange and cannibalization.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4027 (measures 4–9)
- 14T: What are the 14T duty positions by skill level in the STP?
- SL1 launcher operator, SL2 launcher senior operator, SL3 launcher section chief, SL4 launcher/maintenance platoon sergeant.
- STP 44-14T14-SM-TG (15 Mar 2002), ch. 2, MOS training plan, part one, section II
- 14T: Name four of the seven SL1 subject areas in the 14T STP.
- Any four: LS MO&E and PMCS; LS maintenance; road march and vehicle ops; missile reload; communications; surviving to operate (STO); support maintenance equipment.
- STP 44-14T14-SM-TG (15 Mar 2002), ch. 2, MOS training plan, part one, section I
- 14T: Where are LS emplacement and march order first trained, and how often should units sustain them?
- In AIT; sustain quarterly (SL1–3).
- STP 44-14T14-SM-TG (15 Mar 2002), ch. 2, MOS training plan, part two (tasks 441-082-1100 and -1102)
- 14T: What GO/NO-GO standard applies to STP task evaluations?
- GO only if every performance measure is passed; NO-GO if any is failed, then show the correct method.
- STP 44-14T14-SM-TG (15 Mar 2002), ch. 1 (feedback) and ch. 3 evaluation guidance
- 14T: Which Patriot launcher fault-related items does a 14T SL1 work on, per DA Pam?
- Operator/organizational maintenance and PMCS on the LS, ELES, LSTS and the Patriot missile round, plus missile resupply/reload.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(1)
- 14T: What does a 14T3 add over a 14T2?
- Supervises LS operations and maintenance, enforces safety, runs unit training, does operations/intel and liaison, and supervises tactical comms.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(2)–(3)
- 14T: What are the 14T minimum OPAT scores?
- Long jump 120 cm, power throw 350 cm, deadlift 120 lb, interval run 36 shuttles (Moderate/Gold).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para b(4)(b)
- 14T: What maintenance-management duties does a 14T4 assist with?
- Maintenance records, demand-supported/diagnostic repair parts stockage, and designing the unit maintenance program.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(4)
- 14T: Describe Area E for a PAC-3/MSE launch.
- The primary forward danger area (launch debris, overpressure, blast, noise): a 152 m radius circle to the sides plus an ellipse reaching 183 m in front.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-6b(1)(a)
- 14T: Describe Area F for a PAC-3/MSE launch.
- The rear danger area (motor plume, backblast debris, hot gases, noise): a 152 m radius circle, an ellipse 183 m to the rear, and a triangle 152 m aft by 91 m wide.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-6b(1)(b)
- 14T: What is the PAC-3/MSE launcher safe separation distance?
- A 442 m radius within 42° either side of the launcher flight centerline, vertex at the launcher.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-6b(1)(d)
- 14T: What do the PAC-3/MSE launch-area danger zones assume about the target?
- That it's forward of the launcher, in the general direction the launcher points.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-6a(2)
- 14T: Within how long after passing the target does a legacy Patriot missile self-destruct if the fuze didn't function?
- Within 2.2 seconds.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-5b(4)
14T – Part 4: Perimeter Defense, Road March Standards and Live-Fire Safety
Source: STP 44-14T14-SM-TG, Soldier's Manual and Trainer's Guide, MOS 14T (15 Mar 2002; public release); AR 385-63/MCO 3570.1D (23 May 2025), ch. 13
- 14T: When a fire unit's perimeter defense comes under attack, how should the leader direct the defense?
- Control the opening of fire and fire discipline (rate and distribution), shift fires to the most dangerous targets, request indirect fire to suppress or destroy the enemy, shift crew members and weapons to threatened points, halt platoon fires as required, and keep the commander informed.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4029 (step 3)
- 14T: What areas of concern should a fire unit's defense plan consider, such as dead space and terrain?
- Dead space, prominent terrain features, the ability for rapid displacement, light and noise discipline, protection of critical supplies and personnel, communications, and OP and LP positions.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4029 (step 1 note)
- 14T: What goes on the section or platoon defense overlay and range cards for perimeter defense?
- Each crew's defensive position; each machine-gun position with its final protective line or principal direction of fire; primary and secondary sectors for each LAW or MK-19; major obstacles and antipersonnel mines; Stinger positions; and trip flares.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4029 (step 1a–1d, 1g, 1i, 1j)
- 14T: In road march movement, which control points and march details must all personnel be told about?
- Departure time, the road march objective and order of march, start, release and intermediate checkpoints, actions at planned halts, and how to use blackout lights to keep intervals.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4025 (measure 1)
- 14T: For PAC-3/MSE live fire, who sets the surface danger zone safety parameters, and what strongly affects debris impact areas?
- The specialized range safety office, using analysis and simulation for the mission scenario. Debris impact areas depend heavily on the wind profile at the time of the mission.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-6
- 14T: For PAC-3 live-fire safety, where must the debris danger areas from drones on normal flight paths be contained?
- Within the impact area for PAC-3 and PAC-3 MSE missiles. Target drones with abnormal flight paths or that go out of control are not covered by AR 385-63.
- AR 385-63/MCO 3570.1D (23 May 2025), para 13-6a(4)
- 14T: What standard must the road march monitoring task meet?
- Personnel are briefed on road march objectives before start time, and all equipment and personnel reach the predetermined point within the time set by local command directives, with no injury, no equipment damage and minimal environmental damage.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-4025 (standards)
- 14T: What form records a hands-on evaluation of STP tasks, and is using it required?
- DA Form 5164-R (Hands-On Evaluation). Its use is optional, but it lets the trainer keep information on Soldier proficiency.
- STP 44-14T14-SM-TG (15 Mar 2002), appendix A (note to the trainer)
14T – Part 5: Generator and BMC March Order
Source: STP 44-14T14-SM-TG, Soldier's Manual and Trainer's Guide, MOS 14T (15 Mar 2002; public release)
- 14T: Which TMs set the standard for march ordering the 15-kW generator set, and what are its steps?
- TM 9-6115-464-12 or TM 5-6115-465-12. De-energize the generator set, disconnect the BMC and SRPT power cables from the distribution box, and couple the generator to the prime mover.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1414 (standards and performance measures); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
- 14T: When march ordering the BMC for road movement, what gets secured, and what's the final safety check?
- Secure the shelter, antennas, air conditioner covers, extension ladder, power cable and interior sliding door, lock the access doors, stow the boarding ladder, connect air brake hoses and power cable, couple the tractor, stow landing gear, cranks and chocks. Last, inspect the vehicle for safety and proper operation.
- STP 44-14T14-SM-TG (15 Mar 2002), task 441-084-1411 (performance measures 1–15); 2002 edition, still the latest public 14T STP, so steps may differ on current equipment
14T – Part 6: Who Authorizes Patriot Engagements
Source: FM 3-01, Air and Missile Defense Operations (26 Aug 2025), ch. 3
- 14T: Which authority approves engagements by your fire unit, and under what ROE?
- Joint engagements follow directives from the AADC as the engagement authority, or a delegated regional or sector commander. Engagement authorizations usually reach Patriot and THAAD units through an ADAFCO. Division and BCT ADA commanders use ROE approved by the joint force commander, and engagements are usually decentralized to fire unit level.
- FM 3-01 (26 Aug 2025), para 3-117
14T – Part 7: Training to Standard on Gunnery Tables
Source: FM 3-01, Air and Missile Defense Operations (26 Aug 2025), ch. 1
- 14T: What standard do ADA units train to, and how prescriptive are gunnery tables?
- ADA units train to standard using gunnery tables, building from individual procedures to section, team and higher collective proficiency. The tables are prescriptive for all units but let commanders pick standardized engagements from a menu, and they should be adapted to the specific area of operations.
- FM 3-01 (26 Aug 2025), paras 1-87 and 1-88
14T – Part 8: Unit Certification Programs
Source: FM 3-01, Air and Missile Defense Operations (26 Aug 2025), ch. 1
- 14T: How are ADA Soldiers, leaders and teams certified, and how often?
- Usually with gunnery tables. Units certify individual Soldiers and leaders; teams are certified by one or two higher levels (generally the ADA battalion and brigade), depending on the system. Re-certification is periodic, to keep mastery of AMD operations.
- FM 3-01 (26 Aug 2025), para 1-92
14T – Part 9: Training Standards and Task Atrophy
Source: FM 3-01, Air and Missile Defense Operations (26 Aug 2025), ch. 1
- 14T: Who keeps ADA training standards high, and how is task atrophy countered?
- ADA commanders, who build and sustain individual, crew and unit proficiency. Skills naturally erode over time (task atrophy), so leaders use available training resources and a progressive, focused approach to individual and collective training with live, virtual and constructive methods.
- FM 3-01 (26 Aug 2025), para 1-91
14T – Patriot Launching Station Enhanced Operator/Maintainer
Source: DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T); DA Pam 611-21 figure 10-1 (Enlisted MOS Charts, Nov 2025); FM 3-01 (26 Aug 2025); AR 385-63/MCO 3570.1D (23 May 2025); ATP 3-01.85, Patriot Battalion Techniques (31 Jan 2019; distribution-restricted on APD) (CAC/CUI – not independently verified; verify in current edition); AUSA (1 Jun 2026), Task & Purpose (24 Apr 2026) and MILPER 26-120 on 14W (sources/web/cmf13_14_17_excerpts.txt). Verify current editions.
- 14T: What is MOS 14T?
- Status: current MOS (DA Pam 611-21 ch. 10C); not replaced by 14W. 14T is the Patriot Launching Station Enhanced Operator/Maintainer.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) heading; DA Pam 611-21 figure 10-1 (Enlisted MOS Charts, Nov 2025) (14T grades 3–7); Task & Purpose (24 Apr 2026: "the Army is not getting rid of 14E and 14T MOSes") (sources/web/cmf13_14_17_excerpts.txt)
- 14T: What is the 14T's main job?
- Emplacing, initializing, operating, and maintaining the Patriot Launching Station (LS), Enhanced Launcher Electronic System (ELES), Patriot missile rounds, and associated equipment. 14Ts also do missile resupply and reload.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a
- 14T: What is the LSTS?
- The Launching Station Test Set, which 14Ts operate to check launchers, per 10C.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(1) ("Operates and performs Launching Test Set (LSTS) ... maintenance and PMCS")
- 14T: What does "march order and emplacement" mean for a 14T?
- Preparing the launching station to move, then setting it up and initializing it at a new position.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) paras a and a(1) ("Performs march-order and emplacement of LS"; "Initializes, operates")
- 14T: What maintenance is a 14T authorized to do?
- Operator/organizational-level maintenance: BIT/BITE, basic TMDE (e.g., multimeter checks), inspections, adjustments, BRU/LRU replacement as the MAC allows, and PMCS.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a
- 14T: What ASVAB score does 10C list for 14T?
- A minimum score of 87 in aptitude area OF.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para b(4)(a) ("A minimum score of 87 in aptitude area OF")
- 14T: What physical demands rating does 14T carry?
- Moderate (Gold), physical profile 222221, with normal color vision required.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) paras b(1)–(3)
- 14T: What clearance is required for 14T?
- SECRET eligibility, for initial award and to keep the MOS. U.S. citizenship is also required.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) paras b(5)–(6)
- 14T: Where is 14T trained?
- The U.S. Army ADA School at Fort Sill, OK. Verify the current course length on goarmy.com.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para b(7) (course under the U.S. Army ADA School); 10-14P para c(1) gives the ADA address as Ft Sill, OK 73501
- 14T: What skill levels does 10C describe for 14T?
- Skill levels 1–4, which correspond roughly to E-3/E-4 through SFC. The senior capper is 14Z.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) paras a(1)–(4) (MOSC 14T1O–14T4O); DA Pam 611-21 figure 10-1 (Enlisted MOS Charts, Nov 2025) (14T grades 3–7; 14Z 8–9)
- 14T: What does a 14T at skill level 4 do?
- Monitors LS platoon operations and maintenance, trains and certifies Patriot LS crews in AD table crew drills, and helps run the unit maintenance program.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(4)
- 14T: What ASIs can a 14T earn?
- Examples from 10C: X8 THAAD Launcher Operator/Maintainer, T4 Patriot Master Gunner (SL3–4), M9 Master Driver Trainer (SL3–4), T3 GMD, and 4E AMD Master Gunner (E-6–E-7, effective 2027).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) paras c(1), (2), (4)–(6)
- 14T: How does 14T relate to 14W?
- 14W (effective 1 Oct 2026) combines the 14E and 14T skill sets. 14T remains a current MOS, and 14T Soldiers can volunteer to reclassify into 14W.
- AUSA (1 Jun 2026; 1 Oct 2026) and Task & Purpose (24 Apr 2026) on MILPER 26-120 (sources/web/cmf13_14_17_excerpts.txt); 14W is not yet in DA Pam 611-21 ch. 10C (Oct 2026 copy)
- 14T: What vehicles and power equipment do 14Ts maintain?
- Patriot prime movers and prime power units, with operator PMCS.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(1) ("operates and performs PMCS on Patriot Prime Movers and Prime Power Units")
- 14T: What are key launcher safety concerns?
- For live fire, the Patriot SDZ is cleared of everyone except personnel actively engaged in the firing, who should use approved shelters at least 90 m from the launcher. Missile handling, reload, high-voltage and hydraulic hazards follow the TMs and range/site SOPs.
- AR 385-63/MCO 3570.1D (23 May 2025) paras 13-5a(1) and a(3), figure 13-6 (launch area); handling, high-voltage and hydraulic precautions: Not independently verified – likely in restricted TM (CAC) (ATP 3-01.85; Patriot launcher TMs)
- 14T: What communications duties do 14Ts have?
- Establishing and maintaining radio and wire communications.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-14T) para a(1) ("Establishes and maintains radio and wire communications"); a(3) (supervises tactical communications)
Keep going: more Air Defense Artillery decks
- 14HAir Defense Enhanced Early Warning System Operator363 cards
- 14GAir Defense Battle Management System Operator273 cards
- 14PAir and Missile Defense Crewmember240 cards
- 14EPatriot Fire Control Enhanced Operator/Maintainer85 cards
- 14WAir and Missile Defense Systems Repairer50 cards
- 14ZAir Defense Artillery Senior Sergeant45 cards
Not your job? Use the MOS deck finder or see every MOS deck by career field.